
4. Recommended Method for Full Floor Installation
PNEG-222
48' Diameter Bin Cor-Lok and Cut-Lok Flooring
15
IMPORTANT:
First piece of flooring must start at the proper distance from centerline of bin. Refer to floor
. First piece may need to be trimmed for length to fit at the proper location.
Figure 4C
4. Install flooring starting at the bin wall on the opposite side of the unload auger. Floor planks should be
placed perpendicular to the unload auger with the outside edge the correct distance from the center
of the bin.
Be sure the flat edge of the floor plank is facing the bin wall
and the open channel edge (E) is facing towards the center of the bin.
Position the
supports for the first/shortest floor plank according to the number of bin rings and corrugation as
shown in the illustrations
or stated in the charts
. Attach the flashing
to flooring and bin wall to hold plank in place. (
for flashing installation.)
Ref #
Description
Ref #
Description
E
Open Channel Edge
I
Inside Hook
F
Flat Edge
J
Straight Tab
G
Bin Wall
K
Outside Hook
H
Correct Assembly Method
L
The Grandstand
Attach flashing to ends of first plank here, just to
hold it in place.
NOTE:
These two (2) pieces of
flashing will need to be removed and repositioned
when installing the rest of the flashing.