Inserting Discharge Flight
1. Once the discharge tube has been bolted to the unload tube, slide the discharge flight into the tube
and align the connecting shaft holes with the holes on the unload flight.
2. Align the drive unit discharge flight to the unload flight, making sure that the Dura-Edge® on both
are as continuous as possible, the angle between both faces being less than 90° wherever
possible, but not greater than 180°, and without overlapping.
NOTE:
Overlapping the flights, or having an angle between the ribbon faces be greater than 180°,
will result in reduced unload capacity.
3. With holes aligned, secure with grade 8 bolts and stover nuts.
Figure 4B
Summary of Contents for PNEG-1429
Page 2: ...2 PNEG 1429 Horizontal Drive Units...
Page 32: ...32 PNEG 1429 Horizontal Drive Units NOTES...
Page 34: ...10 Parts List 34 PNEG 1429 Horizontal Drive Units 6 Farm Duty Horizontal Drive Unit Parts...
Page 36: ...10 Parts List 36 PNEG 1429 Horizontal Drive Units 8 Farm Duty Horizontal Drive Unit Parts...