A crane of adequate capacity attached to a spider assembly
with cables connecting at each vertical sidewall seam just
above the legs can also be used to lift the tank. Make sure
the tank is being lifted smoothly and evenly. Raise it
enough to assemble the next ring and/or to attach the legs.
Reference a qualified rigger.
Watch for power
lines.
The crane and anything
associated with building the bin (due
to height) can get in the way of
power lines.
12' 60° & 15' 60° Leg Attachment
(for 12' 60° & 15' 60° Tanks Only)
Curved Washer are supplied in the hardware packages. These washers must be installed at the Bottom Leg to Sidewall
Bolt Connection, to the inside of the Hopper Panel as indicated in the Illustration Below.
Apply caulking in between the hopper panel and the sidewall sheet.
5/16" x 11/4" Bin
Bolt (S277)
Leg
Sidewall Sheet
Hopper Panel
10 Ga. Curved Washer
(Blk12483)
5/16" Hex Nut (S396)
Summary of Contents for BFT 12
Page 1: ...12 15 18 21 Bulk Feed Tanks BFT GHT Series Assembly Manual PNEG 257 Date 09 02 09 PNEG 257 ...
Page 2: ...Bulk Feed Tanks 2 PNEG 257 12 21 BFT ...
Page 11: ...Bulk Feed Tanks 11 PNEG 257 12 21 BFT Plastic Tie ...
Page 14: ...Bulk Feed Tanks 14 PNEG 257 12 21 BFT Foundation ...
Page 15: ...Bulk Feed Tanks 15 PNEG 257 12 21 BFT Foundation ...
Page 16: ...Bulk Feed Tanks 16 PNEG 257 12 21 BFT Foundation ...
Page 17: ...Bulk Feed Tanks 17 PNEG 257 12 21 BFT Foundation ...
Page 18: ...Bulk Feed Tanks 18 PNEG 257 12 21 BFT Foundation ...
Page 20: ...Bulk Feed Tanks 20 PNEG 257 12 21 BFT Foundation ...
Page 21: ...Bulk Feed Tanks 21 PNEG 257 12 21 BFT Foundation ...
Page 22: ...Bulk Feed Tanks 22 PNEG 257 12 21 BFT Foundation ...
Page 23: ...Bulk Feed Tanks 23 PNEG 257 12 21 BFT Foundation ...
Page 24: ...Bulk Feed Tanks 24 PNEG 257 12 21 BFT Foundation ...
Page 31: ...Bulk Feed Tanks 31 PNEG 257 12 21 BFT Roof ...
Page 85: ...Bulk Feed Tanks 85 PNEG 257 12 21 BFT NOTES ...