Bulk Feed Tanks
39
PNEG257
12'21' BFT
Ro of
After completing first ring assembly, you are ready to begin roof
construction. First, build a roof center support to hold the peak
ring in place at the proper height. A simple structure consisting
of a sturdy cross arm attached to a pole and supported by a plat
form or scaffolding will do. Stand the center support directly in
the center of the tank. The bottom of the peak ring should be
89.5/16" (2269 mm) above the foundation on the 18' tank and
78.15/16" (2005 mm) above it on the 15' tank. These dimensions
are approximate ones used in BFT construction. Adjusting the
center support height will ease roof erection. Refer to the accom
panying drawings for details. Install 6 roof reinforcement angles
spaced equally around the tank. Reinforcement angle edges are
parallel with sidewall sheet and peak ring, see views "AA" and
"DD".
The reinforcement angles utilize every other hole in the the
peak ring. At the sidewall, there are 12 spaces between each
reinforcement angle on the 18' tank and 10 spaces between
each on the 15' tank. Next, "skin" the roof by installing the
roof panels on the just completed reinforcement structure.
Reinforcement angles will share all roof panels holes, including
hole where panel and peak ring attach. Insure that all roof
seams are caulked and lapped correctly as shown in the accom
panying detail drawings.
Sidewall Sheet
Roof Compression Straps
Roof Reinforcement Angle
15' and 18' Roof Assembly Instructions
Summary of Contents for BFT 12
Page 1: ...12 15 18 21 Bulk Feed Tanks BFT GHT Series Assembly Manual PNEG 257 Date 09 02 09 PNEG 257 ...
Page 2: ...Bulk Feed Tanks 2 PNEG 257 12 21 BFT ...
Page 11: ...Bulk Feed Tanks 11 PNEG 257 12 21 BFT Plastic Tie ...
Page 14: ...Bulk Feed Tanks 14 PNEG 257 12 21 BFT Foundation ...
Page 15: ...Bulk Feed Tanks 15 PNEG 257 12 21 BFT Foundation ...
Page 16: ...Bulk Feed Tanks 16 PNEG 257 12 21 BFT Foundation ...
Page 17: ...Bulk Feed Tanks 17 PNEG 257 12 21 BFT Foundation ...
Page 18: ...Bulk Feed Tanks 18 PNEG 257 12 21 BFT Foundation ...
Page 20: ...Bulk Feed Tanks 20 PNEG 257 12 21 BFT Foundation ...
Page 21: ...Bulk Feed Tanks 21 PNEG 257 12 21 BFT Foundation ...
Page 22: ...Bulk Feed Tanks 22 PNEG 257 12 21 BFT Foundation ...
Page 23: ...Bulk Feed Tanks 23 PNEG 257 12 21 BFT Foundation ...
Page 24: ...Bulk Feed Tanks 24 PNEG 257 12 21 BFT Foundation ...
Page 31: ...Bulk Feed Tanks 31 PNEG 257 12 21 BFT Roof ...
Page 85: ...Bulk Feed Tanks 85 PNEG 257 12 21 BFT NOTES ...