
Bulk Feed Tanks
36
PNEG257
12'21' BFT
Control Arm
Note: Use the chart on
page 37 for Control Arm and
Ground Control details.
Control Arm Detail
Make sure the loop of the Main Cap
Spring (BLK11623) is held securely in
the preloaded position by the head of the
5/16" bolt beneath.
If necessary, place one or more 5/16" flat
washers under the bolt head to ensure
that the bolt catches the loop.
The control arm is spring loaded. It must be re
leased while on the ground and before attaching
it to the peak ring. Failure to do so will result in
serious injury.
WARNING
Left hinge
attachment holes
Right hinge attachment
holes
Spring stop
attachment hole
Summary of Contents for BFT 12
Page 1: ...12 15 18 21 Bulk Feed Tanks BFT GHT Series Assembly Manual PNEG 257 Date 09 02 09 PNEG 257 ...
Page 2: ...Bulk Feed Tanks 2 PNEG 257 12 21 BFT ...
Page 11: ...Bulk Feed Tanks 11 PNEG 257 12 21 BFT Plastic Tie ...
Page 14: ...Bulk Feed Tanks 14 PNEG 257 12 21 BFT Foundation ...
Page 15: ...Bulk Feed Tanks 15 PNEG 257 12 21 BFT Foundation ...
Page 16: ...Bulk Feed Tanks 16 PNEG 257 12 21 BFT Foundation ...
Page 17: ...Bulk Feed Tanks 17 PNEG 257 12 21 BFT Foundation ...
Page 18: ...Bulk Feed Tanks 18 PNEG 257 12 21 BFT Foundation ...
Page 20: ...Bulk Feed Tanks 20 PNEG 257 12 21 BFT Foundation ...
Page 21: ...Bulk Feed Tanks 21 PNEG 257 12 21 BFT Foundation ...
Page 22: ...Bulk Feed Tanks 22 PNEG 257 12 21 BFT Foundation ...
Page 23: ...Bulk Feed Tanks 23 PNEG 257 12 21 BFT Foundation ...
Page 24: ...Bulk Feed Tanks 24 PNEG 257 12 21 BFT Foundation ...
Page 31: ...Bulk Feed Tanks 31 PNEG 257 12 21 BFT Roof ...
Page 85: ...Bulk Feed Tanks 85 PNEG 257 12 21 BFT NOTES ...