INSTALLATION
22
PNEG-1521
Commercial Direct Gear Drive Bin Sweep Auger
E. With the Rack & Pinion fully extended towards
the bin wall, attach the Half Band with six
(6) 5/16" x 1-½” Hex bolts, flat washers, and
Serrated Flange nuts.
F. Slide the ¾” Wrenches over the shafts on the
Rack & Pinion, making sure the collar faces the
gears. Fasten the Wrenches with the two
(2) 3/8" x ¾” Flange bolts and flat washers.
8. RACK & PINION INSTALLATION
(Cont.)
On 36’ diameter bins, install the Rack & Pinion using the steps above, noting
that there is no Outside Intermediate Control Rod to attach to, and only one
Rack to operate the Center and Intermediate Wells.
FIG. 8-D
FIG. 8-E