English (GB)
2
English (GB)
Installation and operating instructions
Original installation and operating instructions
CONTENTS
Page
1. General information
1.1 Introduction
These installation and operating instructions contain all the
information required for starting up and handling the DMH 25X
piston diaphragm dosing pump.
If you require further information or if any problems arise, which
are not described in detail in this manual, please contact the
nearest Grundfos company.
1.2 Service documentation
If you have any questions, please contact the nearest Grundfos
company or service workshop.
1.3 Applications
The DMH 25X pump is suitable for liquid, non-abrasive and
non-inflammable media strictly in accordance with the
instructions in this manual.
Identification of safety instructions in this manual
Qualification and training of personnel
Risks when safety instructions are not observed
Safety instructions for the operator/user
Safety instructions for maintenance, inspection and
installation work
Unauthorised modification and manufacture of spare
parts
Safety of the system in the event of a failure in the
dosing system
Ambient and operating conditions
Product description and accessories
Data of contact pressure gauge for diaphragm leakage
detection (optional)
General information on installation
Approximate values when using pulsation dampers
Connecting the suction and discharge lines
Electric servomotor (optional)
Electronic preselection counter (optional)
Electrically heated dosing head (optional)
Diaphragm controller (optional)
Connecting the power supply cable
Initial start-up/subsequent start-up
Start-up/subsequent start-up of DMH 251, 252 and 253 25
Start-up/subsequent start-up of DMH 254, 255 and 257 25
Setting the pressure relief valve
Using the AR control unit (optional)
Electric servomotor (optional)
Electronic preselection counter (optional)
Electrically heated dosing head (optional)
10.2 Diaphragm leakage control for diaphragm leakage
10.3 Cleaning and maintenance intervals
10.5 Cleaning the suction and discharge valves
10.6 Replacing the diaphragm and gear oil for dosing head
with single diaphragm (no diaphragm leakage
detection)
10.7 Replacing the diaphragm for dosing head with double
Warning
These complete installation and operating
instructions are also available on www.grundfos.com.
Prior to installation, read these installation and
operating instructions. Installation and operation
must comply with local regulations and accepted
codes of good practice.
Note
Explosion-proof pumps are identified from the pump
and motor nameplates. An EC declaration of
conformity is provided in accordance with the EC
directive 2014/34/EU, the so-called ATEX directive.
This declaration of conformity replaces the
declaration of conformity in this manual.
Warning
To operate a pump which has been identified as an
explosion-proof pump for the dosing of inflammable
media or for operation in potentially explosive
operating sites in accordance with the EC directive
2014/34/EU, refer to the enclosed manual
"ATEX-approved pumps" in addition to this manual.
Warning
Other applications or the operation of pumps in
ambient and operating conditions, which are not
approved, are considered improper and are not
permitted. Grundfos accepts no liability for any
damage resulting from incorrect use.