Prepare and Square Building Site

PREPARE BUILDING SITE

A level site is required to accurately and safely construct building. Consult 

the services of a qualified contractor to properly grade and prepare site.

Site should slope away from building for proper water drainage.

After site is prepared, mark locations of frame corners to square frame 

position. Taking these steps 

before

 shelter assembly begins saves time and 

ensures that structure is square and positioned as desired. 

The following procedures are suggested methods. Their use depends on 

shelter size, shelter use, footings (if applicable), and the method used to 

anchor the shelter. 

When in doubt, consult the services of a qualified contractor experienced 

with the construction of similar structures.

Ground Posts

 

Ground posts can be set in concrete as described within this manual. Or, 

anchor building frame as described in the MUST READ document.  

SQUARE SITE: GENERAL STEPS

1.  Identify a corner where a ground post will be set, drive a stake, and 

string a line the building width. Stake in place. (Width of frame is 

measured from center-to-center of ground posts.)

2.  After placing first corner stake, string a line the frame width (center-to-

center of ground posts) and drive second corner stake.

3.  String a line longer than the building 90° from the line between the first 

and second stakes. 

NOTE:

 A transit can be used to ensure an accurate 90° angle, or the 

3-4-5 rule can be used. Refer to diagram. Using multiples of 3-4-5 such 

as 6-8-10 or 12-16-20 helps to maintain an accurate 90° angle.

4.  After squaring frame position, measure length and drive the third corner 

stake.

5.  Repeat the same step to set last corner stake. 

 

NOTE:

 The distance measured diagonally between 

corner stakes

 must 

be equal for building to be square.

SET GROUND POSTS IN CONCRETE

Sandy or loose soil requires setting ground posts in concrete. Review 

the layout diagrams for additional details. Follow all local and regional 

building codes during construction.

Enlist the services of a professional and competent contractor to 

prepare site and set ground posts.

Failing to secure ground posts in concrete as required may result in 

damage to frame, frame contents, and surrounding property and may 

void warranty.

Shelter width is measured from ground post center to ground post center. 

Length is also measured ground post center-to-center. 

Summary of Contents for 113463H

Page 1: ...ved Reproduction is prohibited without permission GrowSpan Roll Up Low Pro Tunnel STK DIMENSIONS 113463H B C 20 W x 5 H x 24 L 113464H B C 20 W x 5 H x 36 L 113465H B C 20 W x 5 H x 48 L Actual buildi...

Page 2: ...chor assembly is an integral part of the high tunnel construction Improper anchoring may cause tunnel instability Failing to anchor tunnel properly may void manufacturer s warranty and may cause serio...

Page 3: ...concrete continue with next procedure 12 Install tighten and secure end panels 13 Install tighten and secure main cover 14 Read care and maintenance information 15 Complete and return all warranty in...

Page 4: ...not allow cover to remain open for extended time Periodically unroll cover for cleaning and to allow it to dry Remove debris and objects that accumulate on cover Use tools that will not damage cover w...

Page 5: ...dle Support Lock 115287 Stabilizer Bar FA4110 FA4115 Hook Loop Fasteners FA4110 FA4115 102856 End Clamp 102197 Aluminum U Channel 102548 Cross Connector FA4472B Tek Screw 103395 Spin Handle 103396 Uni...

Page 6: ...of frame is measured from center to center of ground posts 2 After placing first corner stake string a line the frame width center to center of ground posts and drive second corner stake 3 String a l...

Page 7: ...ring frame as described in the MUST READ document do not auger holes for ground posts Instead follow the steps to mark ground post locations and drive posts into the ground at those locations See info...

Page 8: ...ts in place See diagram below All posts to be plumb before adding concrete Use mounting holes in posts and customer supplied fasteners and stakes to hold posts in place 3 Add concrete to anchor posts...

Page 9: ...Tek screws Wrap screws and slices with duct tape Gather parts Rafter pipes LPT166ES1W20 LPT166PS1W20 166S0755 FA4472B Tek screws 100442 magnetic nut setter Duct tape STEP 1 Select rafter pipes to ass...

Page 10: ...d or have an assistant hold until next rafter is added and connected with purlins 3 Set next rafter in place and secure using 5 16 bolts and nuts ATTENTION Only the two end rafters use 102856 end clam...

Page 11: ...art section for additional information and pipe identification Purlin runs end to end down center at top of each rafter ATTENTION At this time do not install brackets that secure square peak purlin to...

Page 12: ...f cover is shown rolled to peak Cover is installed later 2 Assemble end panel conduit using the 1 315 pipe noted above secure each pipe joint with Tek screw and tape over screw Slide conduit into pock...

Page 13: ...of end panel Attach each end of conduit to ground post using Tek screws and QH1330 brackets 3 Measure between end rafter ground posts to determine final conduit length Cut assembled conduit to fit if...

Page 14: ...as needed so zippers function properly then continue 10 Drive a Tek screw through each clip and into rafter Position screws in a location that will not contact cover material Tape over screw if neede...

Page 15: ...alternative steps for installation On the outside of frame attach first baseboard ground post using two 2 5 16 carriage bolts and nuts Countersink bolt heads if carriage bolts are not used Continue a...

Page 16: ...ION 115287 Gather parts 115287 curtain stabilizer bars GS0049 splice plate FA4472B Tek screws 100442 magnetic nut setter 5 Stabilizer Bar Ground Level Ground post installed 2 below grade Install bar a...

Page 17: ...conduits one for each side See side profile diagrams in Quick Start section for details and pipe identification NOTE Secure each pipe splice with a Tek screw and wrap connection with duct tape to pro...

Page 18: ...below for frame cover material Solid Black Silver Cover B Diagrams show attaching aluminum bar 110155 through cover and into peak purlin of frame Install Tek screws approximately 17 on center through...

Page 19: ...ame after removing excess material Check cover length NOTE Once cover is wrapped around conduit conduit should rest on ground next to frame when length is correct See photo inset right 3 Unroll cover...

Page 20: ...to 36 extension pipe using one 1 Tek screw 2 Slide 6 easy spin pipe 166P006 onto free end of 36 extension pipe 3 Attach universal joint to end of 36 extension pipe 4 Attach assembly to roll up cover...

Page 21: ...n all remaining locations on frame 8 Beginning with one side roll cover down to stabilizer bar and lock cover into place 9 Verify cover is positioned as desired on frame HOOK LOOP LOCATION GUIDE END R...

Page 22: ...rom rafter splice Positon B Approx 36 from top center of rafter Positions C Mid point between A B A C Top Center Ground Level 36 12 B B C A GROUND LEVEL X X X X X X X Length 48 GROUND LEVEL X X X X Le...

Page 23: ...Repeat as cover rolls down tunnel frame End fasteners can be reached when cover is locked down Film is shown Actual cover may differ ATTENTION Never leave cover partially open Cover must be fully ope...

Page 24: ...Guide GrowSpan Roll Up Low Pro Tunnel 20 Wide Frame ATTENTION Diagram shows optional baseboard installed below stabilizer bar If baseboard is not used install stabilizer bar at ground level Ground Le...

Page 25: ...ER TO CENTER OF GROUND POSTS 2 0 EMBEDMENT 5 5 1 8 GROUND LEVEL TO STRUCTURE PEAK 2 5 1 4 GROUND LEVEL Customer Supplied Baseboard Optional Customer Supplied Baseboard Optional ATTENTION Diagram shows...

Page 26: ...5 GROUND POST 102675 RAFTER LPT166ES1W20 RAFTER LPT166ES1W20 RAFTER LPT166PS1W20 RAFTER 166S0755 RAFTER 166S0755 ALUMINUM BAR 110155 IF APPLICABLE PURLIN BRACKET END 102856 MID 102548 PURLIN BRACKET E...

Page 27: ...ar If baseboard is not used install stabilizer bar at ground level 4 0 RAFTER SPACING 24 0 CENTER TO CENTER OF GROUND POSTS 2 0 EMBEDMENT GROUND LEVEL SIDEWALL PURLIN SIDEWALL PURLIN ROLLUP CONDUIT 13...

Page 28: ...ROUND LEVEL SIDEWALL PURLIN PEAK PURLIN STABILIZER BAR 131S075 5 131P0735 1 PEAK PURLIN 102897 4 S15P048 1 STABILIZER BAR 115287 3 SIDEWALL PURLIN ROLLUP CONDUIT CUSTOMER SUPPLIED BASEBOARD OPTIONAL A...

Page 29: ...ar If baseboard is not used install stabilizer bar at ground level 4 0 RAFTER SPACING 48 0 CENTER TO CENTER OF GROUND POSTS 2 0 EMBEDMENT GROUND LEVEL SIDEWALL PURLIN PEAK PURLIN STABILIZER BAR 131S07...

Page 30: ...4_65HBC Revision date 08 27 19 Connections VIEW 3 CONNECTION VIEW 6 VIEW 1 CONNECTION VIEW 2 VIEW 5 CONNECTION VIEW 9 CONNECTION VIEW 8 CONNECTION VIEW 7 VIEW 4 CONNECTION ATTENTION Optional baseboard...

Page 31: ...vision date 08 27 19 113463_64_65HBC Frame Connection Details install through side of tube install through side of pipe VIEW 3 VIEW 2 VIEW 1 VIEW 4 VIEW 6 VIEW 7 NOTE VIEW 8 VIEW 5 5 VIEW 9 Center of...

Page 32: ...PLODED VIEW 2X 12 X 1 TEK SCREW EVERY 17 ALUMINUM BAR 110155 BLACKOUT MATERIAL PURLIN 1 5 SQ BLACKOUT MATERIAL CONNECTION PEAK IF APPLICABLE CLEAR FILM CONNECTION PEAK IF APPLICABLE NOTE BLACKOUT COVE...

Page 33: ...ce Photo above shows frame with film cover Cross connectors secure side purlin to rafters Stabilizer bar is shown secured to outside of frame and runs near ground level the full length of the frame Th...

Reviews: