background image

Item

Name

 

Function

F

Power LED

Power indicator light, steady light means power 

supply is normal

G

Network LED

Network light:

1: No light means fail to obtain IP address; 

         

2: Flashing light means connecting to the server

     

3:Steady light means connected to the server

;

H

Device LED

The number of the LED continuously flashing means 

the number of device connected to the ShineMaster

I

Configuration 

LED

 

Flashing when configuration , if successful , the LED 

will be off 

temporarily unavailable

J

RF

 

RF signal indicator 

temporarily unavailable

K

4G

  

4G signal indicator

L

Status light

The LED light is flashing when there is a error

table 2-2

2.2 Unpacking

2.2.1 Packing List

Check ShineMaster and accessories are intact and complete as below figure 2-2

: 

If any damage is found or any component is missing, contact your supplier. 

Fig 2-2

Item

Name

 

Amount

A

ShineMaster

1 pcs

B

5V power adapter

1 pcs

C

Terminal RS485

1 pcs

D

Wall plastic column

 

4 pcs

E

M3.5*20 screw

4 pcs

F

ShineMaster user manual

1 pcs

G

Ethernet cable

1 pcs

H

4G Antenna

 

1pcs(The 4g version)

Table 2-4

4

5

A

B

C

D

E

F

G

H

Note: 1:the above accessories ShineMaster 4 g version to configuration in 4 g antenna

          2:4G sim card needs purchased from Local Telecommunication service provider .

Summary of Contents for ShineMaster

Page 1: ...User Manual SHENZHEN GROWATT NEW ENERGY TECHNOLOGY CO LTD 86 755 2747 1942 86 755 2747 2131 service ginverter com www ginverter com T F E W No 28 Guangming Road Shiyan Street Bao an District Shenzhen...

Page 2: ...nstallation 3 3 Connect to the photovoltaic device Installation and Connection CONTENT ShineMaster internal page parameter setting 2 1 Device Overview 2 2 Unpacking 2 3 ShineMaster Network Introductio...

Page 3: ...ped and produced by Shenzhen Growatt New Energy Co Ltd hereinafter referred to as Growatt We sincerely hope that this product will meet your needs and expect you give more opinions on the performance...

Page 4: ...ve wireless signals B KEY Reset button C POWER Power supply port D SIM SIM card slot E ANT1 Rf antenna interface N LAN RJ45 port Connect Shine ShineMaster to the local network area of Shine Server thr...

Page 5: ...unavailable K 4G 4G signal indicator L Status light The LED light is flashing when there is a error table 2 2 2 2 Unpacking 2 2 1 Packing List Check ShineMaster and accessories are intact and complete...

Page 6: ...oad the monitored data to the server of Growatt and then access the server s domain name with the industrial common communication mode RS485 and wireless RF communication ShineMaster can also supports...

Page 7: ...ort and RS485 port on ShineMaster please refer to 3 3 1 below for details 1 2 3 Communication mode options The standard version Connect the network cable The 4G version Connect 4G antenna insert the 4...

Page 8: ...res Take an example with TP_LINK router 1 Get in the router management page 2 Click on the DHCP server client list 3 Find the same as the serial number of the collector SN the client name This IP is t...

Page 9: ...ent it is necessary to enter the ShineMaster Data Collector Settings page of the internal page to add devices 2 In the second pull down list select the type of monitored device 12 13 Device types para...

Page 10: ...hod for monitoring PV devices in the first drop down list of Add or Remove Devices 2 In the second pull down list select the type of PV plant being monitored 3 Fill in the PV device communication addr...

Page 11: ...he momemet you add this device like 485 channel device type address if you are not sure about this you can check the device status first 2 When one address is occupied you cannot just paste the new de...

Page 12: ...hoose two methods one is IP and one is domain name you can only use one at a time when you are using the domain name to connect server you can choose on at Domain Name Analysis Function set the server...

Page 13: ...the first time register the user name first Enter the domain name access page as shown in Figure 5 1 The Chinese user server domain name is http server cn growatt com The overseas user server domain...

Page 14: ...logger check code can be found on the package box Fig 5 2 5 2 Monitoring data 1 After the registration is completed it will automatically skip to the ShineServer main interface Click plant plant data...

Page 15: ...d Box MAX 24 25 5 3 Add or Delete Monitoring devices change the ShineMaster Baud rate 5 3 1 Add or Delete Monitoring device 1 In the Server page click the Device Management and then click Data Logger...

Page 16: ...ill pop out 5 3 2 Change ShineMaster Baud rate 1 In the Server page click Device Management then click Data Logger click the Baud rate setting icon 2 Set chosen channel s baud rate 3 If success follow...

Page 17: ...e 2 Enter the internal page datalogger settings to add photovoltaic devices 3 On the Device Status page of the internal page check whether the device s communication address is the same with the added...

Page 18: ...ame SHENZHEN GROWATT NEW ENERGY TECHNOLOGY CO LTD Address No 28 Guangming Road Shiyan Street Bao an District Shenzhen P R China Customer Service Hotline 86 755 27471942 E mail service ginverter com Co...

Reviews: