0NO0R0004-#
LRR gangway installation manual
Page 7 of 11
4. GANGWAY ENTRY ASSEMBLY
•
Attach the entry platform (
ITEM 4
) to the boiler platform (
ITEM 1
).
Pay attention to the entry platform assembly direction
Caution: do not release the entry platform sharply as this may damage the product. Perform
the operation safely.
Do not walk on the entry platform before the gangway is fully assembled: risk of falling
Pl
boiler
Entry platform
ITEM 4
Attachment HM8x25
w M8
nut
Position one HM8x25
screw + w M8 nut
for articulation
Position one HM8x25
screw + w M8 nut
for articulation
Entry platform
ITEM 4
Pl
boiler
Attachment HM8x25
w M8
nut
Entry platform
ITEM 4
WARNING