LRR gangway installation manual
Page 5 of 11
Before you do anything on the boiler, make sure that you can work safely: boiler powered down,
installer supplied with suitable safety equipment.
Use the right tools and resources when working at heights (ladder, platform)
Once the elements have been assembled, check that the attachments are fully tightened.
3. ASSEMBLING THE GUARD RAILS ON THE PLATFORM:
•
Before starting assembly, check the gangway assembly direction (ladder on the right or left) to avoid any
unnecessary operations.
•
Assembly of the guard rails (
ITEM 2 and ITEM 3
) with the pl boiler. Work on the platform
Use the HM8x25 w nuts in the fittings kit (
ITEM 11
).
Guard rail (
ITEM 2
) attachments with the platform (
ITEM 1
).
Guard rail
ITEM 2 –
Lg900
Guard rail
ITEM 2 –
Lg1500
Guard rail
ITEM 2 – Different length
according to the boiler model
Guard rail
ITEM 2 – Different length
according to the boiler model
Do not
assemble the
guard rail
ITEM 3
Door side
For operator
entry
Guard rail
ITEM 3
Guard rail
ITEM 2
Platform
ITEM 1
Attachment HM8x25
w
M8 nut
Skirting Lg 600
ITEM 9
Attachment HM8x25
w
M8 nut