7
OM-TDH
OM-TDH
7
B. Initial Start-Up
IMPORTANT:
B E SU R E ALL OPERAT ORS R EAD ,
UNDERSTAND AND FOLLOW THE OPERATING
INSTRUCTIONS, CAUTIONS, AND SAFETY
INSTRUCTIONS CONTAINED IN THIS MANUAL.
After the kettle has been installed, the installer should
test to ensure that it is operating correctly.
1. Remove literature and packing materials from inside
and outside of the unit.
2. Add water to the kettle to a depth of at least
one inch.
3. Make sure the supplies of gas and electric power
are on.
4. Follow the
“To Start Kettle Heating”
instructions in
the Operation section of this manual. Begin heating
the water at the highest thermostat setting. The
indicator light should come on and heating should
continue until the water boils.
5. To turn off the unit, follow “To Stop Kettle
Heating” in the
Operation
Section of this manual.
If the kettle functions as described, it is ready for
use. If the unit does not operate as designed,
contact an authorized Groen Service Agent.
WARNING
DO NOT STAND ON OR APPLY UNNECESSARY WEIGHT OR PRESSURE ON THE KETTLE FRONT OR
POURING LIP. THIS COULD RESULT IN THE OVERLOAD AND FAILURE OF THE TILT MECHANISM, AND
POSSIBLE SERIOUS INJURY AND BURNS TO THE OPERATOR AND OTHERS.
Correct Water Level
Make sure that the open end of the elbow on the
pressure relief valve is directed downward.
Summary of Contents for TDH
Page 24: ...24 OM TDH OM TDH 24 Parts List TDHC Units Only...
Page 31: ...31 OM TDH OM TDH 31 115 VOLT SUPPLY Schematic TDH TDHC...
Page 34: ...34 NOTES OM TDH...
Page 35: ...35 OM TDH NOTES...