6 OM-TDB
Inspection & Unpacking
The unit will arrive in a heavy shipping carton
and will be attached to a skid. Immediately upon
receipt, inspect the carton carefully for exterior
damage.
CAUTION
SHIPPING STRAPS ARE UNDER TENSION
AND CAN SNAP BACK WHEN CUT. TAKE
CARE TO AVOID PERSONAL INJURY OR
DAMAGE TO THE UNIT BY STAPLES LEFT
IN THE WALLS OF THE CARTON.
Carefully cut the polyester straps around the
carton and detach the sides of the box from the
skid. Pull the carton up off the unit.
Thoroughly inspect the unit for concealed
damage. Report any shipping damage or
incorrect shipments to the delivery agent.
Write down the model number, serial number,
and installation date, and retain this information
for future reference. Space for these entries is
provided at the top of the Service Log at the
back of this manual. Keep this manual on file
and available for operators to use.
CAUTION
THIS UNIT WEIGHS 140 TO 163 LB. (64 TO
74 KG). INSTALLER SHOULD OBTAIN
HELP AS NEEDED TO LIFT THIS WEIGHT
SAFELY.
When installation is to begin, carefully cut the
straps which hold the unit on the skid. Lift the
unit straight up off the skid. Examine packing
materials to be sure loose parts are not
discarded with the materials.
For TDB units, attach the tilt handle (normally
shipped inside the kettle) by carefully threading it
into the socket on the trunnion support. Be
careful to avoid cross-threading the fine threads
on the trunnion.
NOTE: After handle installation on the right hand
side, retain the hardware supplied with the unit
for left hand installation.
6
OM-TDB
6 OM-TDB
Summary of Contents for TDB
Page 19: ...OM TDB 19 PARTS LIST TDB 20E 40E ...
Page 20: ...20 OM TDB PARTS LIST TDB 20E 40E ...
Page 21: ...OM TDB 21 PARTS LIST TDB 20E 40E ...