OM-TDB/TDBC 9
Initial Start-Up
Now that the kettle has been installed, you should test it to ensure that the unit is
operating correctly.
1.
Remove all literature and packing materials from inside and outside of the
unit.
2.
Turn on the electrical service to the unit.
3.
Pour 1-2 quarts of water into the kettle.
4.
Following “To Start Kettle” instructions in the “Operation” section of this
manual, begin heating the water at the highest temperature setting. The
heating indicator light should come on immediately, and heating should
continue until the water boils.
5.
To shut down the unit, turn the main power switch to “OFF”.
If the unit functions as described above, it is ready for use. If the unit does not function
as intended, first recheck power supply connections and, if necessary, contact your
local Certified Service Agency.
WARNING
AVOID ALL DIRECT CONTACT WITH HOT
SURFACES. DIRECT SKIN CONTACT
COULD RESULT IN SEVERE BURNS.
AVOID ALL DIRECT CONTACT WITH HOT
FOOD OR WATER IN THE KETTLE. DIRECT
CONTACT COULD RESULT IN SEVERE BURNS.
IMPORTANT
BE SURE ALL OPERATORS READ,
UNDERSTAND AND FOLLOW THE
OPERATING INSTRUCTIONS, CAUTIONS
AND SAFETY INSTRUCTIONS CONTAINED
IN THIS MANUAL.
Summary of Contents for TDB 20A
Page 20: ...20 OM TDB TDBC Parts List for TDB For Classic Advanced Control Models...
Page 21: ...OM TDB TDBC 21 Parts List for TDB For Classic Advanced Control Models...
Page 22: ...22 OM TDB TDBC Parts List for TDBC For Classic Advanced Control Models...
Page 24: ...24 OM TDB TDBC Wiring Diagram For Classic Control Models...
Page 25: ...OM TDB TDBC 25 Wiring Diagram For Advanced Control Models...
Page 27: ......