background image

OM-TDB/TDBC         7

The TDB/TDBC Kettle is provided with complete internal wiring and is ready for 

immediate connection. Wiring diagrams are provided in this manual and on the inside 

of the control housing service panel. Any mechanical or electrical changes must be 

approved by Unified Brand’s Engineering Department.

The completed unit has been operated at the factory to test all controls and heater 

elements.

1.  

Set the kettle in place and level it. The base should be securely fastened to a 

table or work surface. Four 3/8”-16 N.C. threaded couplings are provided in the 

base of unit. Installation under a ventilation hood is recommended.

2.  

Once the unit is anchored to a mounting surface, apply a small bead of silicone 

caulk around the perimeter of the kettle base and seal the joint.

3. 

Provide electrical power as specified on the electrical information plate 

attached to the equipment. Observe local codes and/or The National Electrical 

Code in accordance with ANSI/NFPA 70 - (current edition).

4.  

Standard equipment is shipped ready for 208V, 3-phase or 480V, 3-phase 

operation. Refer to the wiring diagram located on the inside cover of the 

control box and the instructions below for conversion to single-phase 

operation. A jumper wire and “conversion” label are  included with the unit. 

They can be found in a plastic bag attached to the trunnion assembly inside 

the control box.

a.  

For conversion from 208V, 3-phase to 208V or 240V 1-phase or 

480V, 3-phase to 480V, 1-phase:

i.  

Verify that the branch circuit wiring is adequate for any 

increased amperage requirements (see table on page 8).

ii.  

For 240V 1-phase only, enlarge electrical inlet opening for 

1” conduit fitting. Use a 1” sealtite conduit fitting.

iii.  

Refer to wiring diagram for field conversion.

iv.  

For 240V 1-phase only, pull lead from 208V tab on control 

transformer and insert on 240V tab (See photo on page 8).

v.  

Complete “conversion label” (supplied in bag) and adhere it 

to the control box near the UL dataplate.

b.  

For conversion from 208V, 3-phase to 240V, 3-phase:

i.  

Verify that the branch circuit wiring is adequate for any 

increased amperage requirements (see table on page 8).

ii.  

Pull lead from 208V tab on control transformer and insert 

on 240V tab. (See photo on page 8)

iii.  

Complete “conversion label” (supplied in bag and adhere it 

to the control box near the UL dataplate).

WARNING 

INSTALLATION OF THE KETTLE MUST BE 

DONE BY A CERTIFIED ELECTRICIAN OR 

AUTHORIZED REPRESENTATIVE QUALIFIED 

TO WORK WITH ELECTRICITY.  IMPROPER 

INSTALLATION CAN RESULT IN INJURY TO 

PERSONNEL AN/OR DAMAGE 

TO EQUIPMENT. 

CAUTION 

BEFORE ANY ELECTRICAL CONVERSION,

VERIFY THAT THE BRANCH CIRCUIT

WIRING IS ADEQUATE TO HANDLE ANY

INCREASE AMPERAGE REQUIREMENTS.

REFER TO THE ELECTRICAL

SPECIFICATIONS LISTED BELOW.

Installation

Summary of Contents for TDB 20A

Page 1: ...nstructions thoroughly before installing or servicing this equipment NOTIFY CARRIER OF DAMAGE AT ONCE It is the responsibility of the consignee to inspect the container upon receipt of same and to det...

Page 2: ...WHEN ADDING INGREDIENTS STIRRING OR TRANSFERRING PRODUCT TO ANOTHER CONTAINER WARNING DO NOT STAND ON OR APPLY UNNECESSARY WEIGHT OR PRESSURE ON THE KETTLE FRONT OR POURING LIP THIS COULD RESULT IN O...

Page 3: ...BBER GLOVES GOGGLES OR FACE SHIELD AND PROTECTIVE CLOTHING CAREFULLY READ THE WARNINGS AND FOLLOW THE DIRECTIONS ON THE LABEL OF THE CLEANER TO BE USED CAUTION USE OF ANY REPLACEMENT PARTS OTHER THAN...

Page 4: ...e 24 25 Service Log page 26 KLENZADE SALES CENTER ECOLAB Inc 370 Wabasha St Paul Minnesota 55102 800 352 5326 or 612 293 2233 NATIONAL FIRE PROTECTION ASSOCIATION 60 Battery March Park Quincy Massachu...

Page 5: ...single electrical connection is required for installation The unit may be ordered for use with 208 240 or 480 volt power All 208 240 volt kettles are wired for 208 volt three phase operation For 240...

Page 6: ...ion date and retain this information for future reference Space for these entries is provided at the top of the Service Log at the back of this manual Keep this manual on file and available for operat...

Page 7: ...e unit They can be found in a plastic bag attached to the trunnion assembly inside the control box a For conversion from 208V 3 phase to 208V or 240V 1 phase or 480V 3 phase to 480V 1 phase i Verify t...

Page 8: ...x near the UL dataplate 5 Bring incoming electrical service through the conduit fitting for 240V 1 phase a new one inch conduit fitting is required at the rear of the support housing making a watertig...

Page 9: ...come on immediately and heating should continue until the water boils 5 To shut down the unit turn the main power switch to OFF If the unit functions as described above it is ready for use If the unit...

Page 10: ...and 10 The current setting will be reflected on the display c Heating indicator light located on the control console lights when the controller energizes the heating elements and will cycle on and off...

Page 11: ...presets cannot be used to change the setpoint once a TIMER has started j READY alarm The control will sound 3 beeps when the unit has reached within 20 degrees of set point during pre heat and when a...

Page 12: ...in a tilted position and slowly return the kettle body to an upright position DO NOT release handle when kettle is partly tilted It will impact in either the upright or fully tilted position and may...

Page 13: ...ds Get help from another person if the basket is too heavy for safe handling d Slowly lower product into kettle e When removing baskets with cooked product lift straight up ensuring basket bottoms cle...

Page 14: ...le is cooling below the set point the switch closes the heating indicator light comes on the contactors close and the heaters come on again On off cycling continues keeping the kettle at the set tempe...

Page 15: ...Do NOT use abrasive materials or metal tools that might scratch the surface Scratches make the surface harder to clean and provide places for bacteria to grow Do not use steel wool which will leave pa...

Page 16: ...sanitizing agent from your supplier of sanitizing products Following the supplier instructions apply the sanitizing agent after the unit has been cleaned and drained Rinse off the sanitizer thoroughl...

Page 17: ...seconds Then release the ring and permit the valve to snap shut If the ring does not activate if there is no discharge or if the valve leaks stop using the kettle immediately and contact a authorized...

Page 18: ...ion must be removed because it will make heating less efficient Follow the procedure in Jacket Vacuum Removing Air From Jacket above to restore a negative pressure reading 5 Water Treatment a Fill a m...

Page 19: ...he same AMP rating X d For loose or broken wires X e Tilt cut off switch X f That pressure switch is open X g Operation of temperature control X h Low water cutoff X Kettle will not heat but heating i...

Page 20: ...20 OM TDB TDBC Parts List for TDB For Classic Advanced Control Models...

Page 21: ...OM TDB TDBC 21 Parts List for TDB For Classic Advanced Control Models...

Page 22: ...22 OM TDB TDBC Parts List for TDBC For Classic Advanced Control Models...

Page 23: ...5229 18a ELECTRICAL MOUNT ASSEMBLY 480V 175579 19 ELECTRICAL MOUNT ASSEMBLY HAND TILT 208 240V 175439 19a ELECTRICAL MOUNT ASSEMBLY 480V 175440 20 TILT SWITCH 002982 21 CONTACTOR 148102 22 GROUND TERM...

Page 24: ...24 OM TDB TDBC Wiring Diagram For Classic Control Models...

Page 25: ...OM TDB TDBC 25 Wiring Diagram For Advanced Control Models...

Page 26: ...26 OM TDB TDBC Service Log Model No Purchased From Serial No Location Date Purchased Date Installed Purchase Order No For Service Call Date Maintenance Performed Performed By...

Page 27: ......

Page 28: ...REV C 07 17 1055 Mendell Davis Drive Jackson MS 39272 888 994 7636 601 372 3903 Fax 888 864 7636 unifiedbrands net 2017 Unified Brands All Rights Reserved Unified Brands is a wholly owned subsidiary o...

Reviews: