Model G0879 (Mfd. Since 6/19)
-15-
NOTICE
If you cannot find an item on this list, care-
fully check around/inside the machine and
packaging materials. Often, these items get
lost in packaging materials while unpack-
ing or they are pre-installed at the factory.
Hardware Bag (Figure 8)
Qty
G. Spool Collar
............................................... 1
H. Contact Tips (0.030", 0.035") ..................... 1
I. Phillips Head Screws M5-.8 X 20 ............... 2
—Lock Washers 5mm ................................ 2
—Flat Washers 5mm.................................. 2
J. Spare Fuses 5A 250V ................................ 2
K. Compression Spring 1 X 20 X 18 ............... 1
L. Spool Nut M10-1.5 ...................................... 1
Figure 8. Hardware bag.
G
H
I
J
K
L
110V
(Power Connection)
Site Considerations
Workbench Load
Refer to the
Machine Data Sheet for the weight
and footprint specifications of your machine.
Some workbenches may require additional rein-
forcement to support the weight of the machine
and workpiece materials.
Consider anticipated workpiece sizes and addi-
tional space needed for auxiliary stands, work
tables, or other machinery when establishing a
location for this machine in the shop. Below is
the minimum amount of space needed for the
machine.
Placement Location
Electrical Installation
Place this machine near an existing power source.
Make sure all power cords are protected from
traffic, material handling, moisture, chemicals, or
other hazards. Make sure to leave enough space
around machine to disconnect power supply or
apply a lockout/tagout device, if required.
Figure 9. Machine clearances.
15"
12"
8
1
⁄
2
"
Summary of Contents for G0879
Page 36: ......