3.3 Electrical connection
11
7
10
9
12
13
Junction box
for the power
supply cable
connection
210-250V
DREDGED GRAVEL
8
Operate the units with the front panel open for 40 minu-
tes before closing them for permanent use.
This precaution will avoid the forming of condensation on
the front glass.
3-4 cm
11