background image

Surge Protection

This product features built-in surge protection circuitry in compliance with 

applicable standards.

For comprehensive protection of a luminaire installation against lightning and  

electrical surges, it is essential to cover mains supply and data input lines at  

the distribution board level, by using respective primary (Type 1) and secondary  

(Type 2) surge arrestors in compliance with EN61643-11/IEC61643-1.

Warning

Ensure that all required surge protection measures are in place and activated  

prior to luminaire installation. Also, disconnect luminaires before operating 

high-power devices such as, for example, electrical arc welders.

Do not open during installation

This product is factory-sealed. 

Refer to the instructions contained in this 

document for details.

WE-EF LEUCHTEN

Installation and Maintenance

Instructions 

Inground Luminaire

ETV100 LED

Summary of Contents for ETV100 LED

Page 1: ...ary Type 1 and secondary Type 2 surge arrestors in compliance with EN61643 11 IEC61643 1 Warning Ensure that all required surge protection measures are in place and activated prior to luminaire instal...

Page 2: ...0282 1304 for 3 x ETV120 186 0308 186 0283 1933 for 4 x ETV120 186 0309 186 0284 2562 for 1 x ETV130 ETV130 CC 186 0310 186 0285 975 for 2 x ETV130 ETV130 CC 186 0311 186 0286 1905 for 3 x ETV130 ETV...

Page 3: ...d Do not use high pressure cleaners In case of component failure due to abnormal circumstances or at end of life replacement must be carried out E D VXLWDEO TXDOL HG DQG WUDLQHG SURIHVVLRQDO Warning D...

Page 4: ...KH OXPLQDLUH LV PRGL HG E DQ ERG RWKHU than the original manufacturer then the warranty will no longer be valid and shall become the full respon sibility of the modifying person organisation Claims ba...

Page 5: ...and or concrete with gravel base Fig I b With fully concreted installation drainage piping must be provided Fig II 3 Test drainage ensure water drains within 30 mins Warning warranty void if luminaire...

Page 6: ...WR EH XVK ZLWK VXUIDFH Attention I RRU ZLOO EH WLOHG RU SDYHG afterwards leave an appropriate gap In case luminaire gets installed at a later time blockout must get covered by installation cover A to...

Page 7: ...blockout B 11 Luminaire is pre wired and LED included Opening the luminaire is not necessary Luminaire Installation Procedure 10 Check that rating shown on luminaire label conforms with mains electric...

Page 8: ...th each sealable junction box G b Cable sheaths must be contained within gel For operation with Tunable White a DALI DT8 controller is required 13 Take sealable junction box G from its bag and open it...

Page 9: ...n head of screws and spacers Lift spacers in an upwards direction 14 Place sealable junction box G and luminaire H inside blockout Make sure no cable is squeezed Attention For LA10 and A6 ensure corre...

Page 10: ...d Tel 41 22 752 49 94 Fax 41 22 752 49 74 info switzerland we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFL F ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 F...

Page 11: ...WE EF LEUCHTEN Installation and Maintenance Instructions Wiring instruction for hybrid DMX cable...

Page 12: ...and maintained by a VXLWDEO TXDOL HG SURIHVVLRQDO LQ FRPSOLDQFH ZLWK ODWHVW building construction and or electrical regulations and relevant legislation 7KH LQVWDOODWLRQ RQ VLWH PXVW FRPSO ZLWK ORFDO...

Page 13: ...D Neutral N blue Earthing green yellow Phase L brown white shield red white shield green STEAB Paguro IP 68 16A 250V 5650 185 1624 0 6 1kV CE N L N L Luminaire DMX Controller Last luminaire AC End of...

Page 14: ...RQQHFW OXPLQDLUHpV SRZHU VXSSO FDEOH A and mains supply cable O and second cable F for through ZLULQJ WR WHUPLQDO EORFN H ZLWKLQ MXQFWLRQ ER D L Phase N Neutral Earthing Attention 5HIHU WR DGGLWLRQDO...

Page 15: ...tie case by cable ties K 6 Connect luminaire s DMX data cables B and external DMX cables E to terminal block I ZLWKLQ MXQFWLRQ box C White DMX Red DMX 6KLHOG 8VH FRUG HQG WHUPLQDOV IRU 0 ZLUHV Attent...

Page 16: ...necting 120 ohm resistor G placed on each junction box C E DGKHVLYH WDSH EHWZHHQ 0 DQG 0 on terminal block I in junction box C QVXUH FDEOHV GR QRW FURVV DQG WKDW FDEOH VKHDWKV DUH FRQWDLQHG ZLWK JHO 7...

Page 17: ...G Tel 41 22 752 49 94 Fax 41 22 752 49 74 LQIR VZLW HUODQG ZH HI FRP WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFL F ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 F...

Reviews: