WE-EF ETV100 LED Nstallation And Maintenance Instructions Download Page 2

1

Inground Luminaire

ETV100

IP67, IK08. Class I. ta = 25°C

L

50

48

Product Dimensions: 

ETV100 series

 

 

 

L

ETV120    

627

ETV130/ETV130-CC  

 

927

ETV140/ETV140-CC  

 

1227

Mounting Accessories:
Installation blockout

  

Type I 

Type II 

 

B = 160 mm 

B = 130 mm 

A

for 1 x ETV120 

186-0306

 

186-0281

 675

for 2 x ETV120 

186-0307

 

186-0282

 1304

for 3 x ETV120 

186-0308

 

186-0283

 1933

for 4 x ETV120 

186-0309

 

186-0284

 2562

for 1 x ETV130/ETV130-CC 

186-0310

 

186-0285

 975

for 2 x ETV130/ETV130-CC 

186-0311

 

186-0286

 1905

for 3 x ETV130/ETV130-CC 

186-0312

 

186-0287

 2833

for 4 x ETV130/ETV130-CC 

186-0313

 

186-0288

 3762

for 1 x ETV140/ETV140-CC 

186-0314

 

186-0289

 1275

for 2 x ETV140/ETV140-CC 

186-0315

 

186-0290

 2504

for 3 x ETV140/ETV140-CC 

186-0316

 

186-0291

 3733

for 4 x ETV140/ETV140-CC 

186-0317

 

186-0292

 496

2

B

                    

                                  d:h

[A6] 

 

 

            1:10

[LA10]   

 

            1:5

Summary of Contents for ETV100 LED

Page 1: ...ary Type 1 and secondary Type 2 surge arrestors in compliance with EN61643 11 IEC61643 1 Warning Ensure that all required surge protection measures are in place and activated prior to luminaire instal...

Page 2: ...0282 1304 for 3 x ETV120 186 0308 186 0283 1933 for 4 x ETV120 186 0309 186 0284 2562 for 1 x ETV130 ETV130 CC 186 0310 186 0285 975 for 2 x ETV130 ETV130 CC 186 0311 186 0286 1905 for 3 x ETV130 ETV...

Page 3: ...d Do not use high pressure cleaners In case of component failure due to abnormal circumstances or at end of life replacement must be carried out E D VXLWDEO TXDOL HG DQG WUDLQHG SURIHVVLRQDO Warning D...

Page 4: ...KH OXPLQDLUH LV PRGL HG E DQ ERG RWKHU than the original manufacturer then the warranty will no longer be valid and shall become the full respon sibility of the modifying person organisation Claims ba...

Page 5: ...and or concrete with gravel base Fig I b With fully concreted installation drainage piping must be provided Fig II 3 Test drainage ensure water drains within 30 mins Warning warranty void if luminaire...

Page 6: ...WR EH XVK ZLWK VXUIDFH Attention I RRU ZLOO EH WLOHG RU SDYHG afterwards leave an appropriate gap In case luminaire gets installed at a later time blockout must get covered by installation cover A to...

Page 7: ...blockout B 11 Luminaire is pre wired and LED included Opening the luminaire is not necessary Luminaire Installation Procedure 10 Check that rating shown on luminaire label conforms with mains electric...

Page 8: ...th each sealable junction box G b Cable sheaths must be contained within gel For operation with Tunable White a DALI DT8 controller is required 13 Take sealable junction box G from its bag and open it...

Page 9: ...n head of screws and spacers Lift spacers in an upwards direction 14 Place sealable junction box G and luminaire H inside blockout Make sure no cable is squeezed Attention For LA10 and A6 ensure corre...

Page 10: ...d Tel 41 22 752 49 94 Fax 41 22 752 49 74 info switzerland we ef com WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFL F ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 F...

Page 11: ...WE EF LEUCHTEN Installation and Maintenance Instructions Wiring instruction for hybrid DMX cable...

Page 12: ...and maintained by a VXLWDEO TXDOL HG SURIHVVLRQDO LQ FRPSOLDQFH ZLWK ODWHVW building construction and or electrical regulations and relevant legislation 7KH LQVWDOODWLRQ RQ VLWH PXVW FRPSO ZLWK ORFDO...

Page 13: ...D Neutral N blue Earthing green yellow Phase L brown white shield red white shield green STEAB Paguro IP 68 16A 250V 5650 185 1624 0 6 1kV CE N L N L Luminaire DMX Controller Last luminaire AC End of...

Page 14: ...RQQHFW OXPLQDLUHpV SRZHU VXSSO FDEOH A and mains supply cable O and second cable F for through ZLULQJ WR WHUPLQDO EORFN H ZLWKLQ MXQFWLRQ ER D L Phase N Neutral Earthing Attention 5HIHU WR DGGLWLRQDO...

Page 15: ...tie case by cable ties K 6 Connect luminaire s DMX data cables B and external DMX cables E to terminal block I ZLWKLQ MXQFWLRQ box C White DMX Red DMX 6KLHOG 8VH FRUG HQG WHUPLQDOV IRU 0 ZLUHV Attent...

Page 16: ...necting 120 ohm resistor G placed on each junction box C E DGKHVLYH WDSH EHWZHHQ 0 DQG 0 on terminal block I in junction box C QVXUH FDEOHV GR QRW FURVV DQG WKDW FDEOH VKHDWKV DUH FRQWDLQHG ZLWK JHO 7...

Page 17: ...G Tel 41 22 752 49 94 Fax 41 22 752 49 74 LQIR VZLW HUODQG ZH HI FRP WE EF LIGHTING Thailand Tel 66 2 738 9610 Fax 66 2 175 2174 LQIR DVLDSDFL F ZH HI FRP WE EF LIGHTING Australia Tel 61 3 8587 0444 F...

Reviews: