4
Blockout Installation Procedure
(during earth or masonry work)
1) Ensure that proper drainage is provided for
the shown installation methods:
a) In landscape/paved areas, sand or concrete
with gravel base (Fig. I).
b) With fully concreted installation, drainage
piping must be provided (Fig. II).
3) Test drainage (ensure water drains within
30 mins,
Warning
: warranty void if luminaire
installed without appropriate drainage)
2) Ensure a suitable recess.
Fig. II
Draining pipe
Fig. I
Fig. I
Fig. Il
4) Remove installation cover
A
out of installation
blockout
B
.