11
INSTALLATION
DISENGAGEMENT OF THE MANUAL RELEASE
8
1. Remove the small front plastic cover from the operator.
2. Put the key into keyhole and turn right.
3. Pull the lever down.
NOTE: To re-engage the opener follow the procedure in reverse.
INSTALLING THE BASE MOUNTING PLATE
7
Underneath the
mounting plate
is the concrete
slab
Mounting
plate
90 - 100mm
Rack
1. Position the base mounting plate as required, referring to the planning section (figure 1).
2. Mark and drill the four masonry anchor holes (figure 2).
NOTE: Position the power cord through the base mounting plate before mounting the base plate.
3. Mount the base mounting plate to the ground or concrete pad using the four masonry anchors provided.
NOTE: Ensure the base mounting plate is orientated in the correct way. The arrow on the base mounting plate needs to be set
towards the gate.
figure 1
figure 2