Page 32
AVFM 5.0 Area-Velocity Flow Meter
SS PIPE MOUNTING BAND – OPTION VSJ
C
OD
E
BA
N
D
SIZE
V
SJ
6
6”/150 mm ID pipes
V
SJ
8
8”/200 mm ID pipes
V
SJ
10
10”/250 mm ID pipes
V
SJ
12
12”/300 mm ID pipes
V
SJ
14
14”/350 mm ID pipes
V
SJ
15
15”/375 mm ID pipes
V
SJ
16
16”/400 mm ID pipes
V
SJ
18
18”/450 mm ID pipes
V
SJ
20
20”/500 mm ID pipes
V
SJ
24
24”/600 mm ID pipes
V
SJ
30
30”/750 mm ID pipes
V
SJ
32-40 32-40” / 800-1000 mm ID pipes
V
SJ
42-54 42-54” / 1100-1375 mm ID pipes
V
SJ
56-72 56-72” / 1400-1800 mm ID pipes
DETAIL
BAND ADJU
S
TMENT
JACK
U
se optional V
SJ
stainless steel
P
ipe Mounting Bands
for eas
y S
ensor installation in round pipes.
Each
P
ipe Band includes:
Band
A
djustment
J
ack allowing ±0.5”
(
13 mm
)
adjustment from
the nominal band size
S
tainless steel bracket for
S
ensor mounting
P
re-drilled for tie wraps
(
included
)
to secure
S
ensor cable
!
!
!
V
S
J
P
I
P
E M
O
UNTING BAND
BAND
ADJU
S
TMENT JACK
S
EN
SO
R M
O
UNTING
BRACKET
Mounting Instructions:
Install the stainless steel pipe band with the
sensor mounting bracket at the invert
(
bottom
)
of the pipe. Ensure that the sensor bracket is
parallel to the water surface
(
check with a
level
)
. Mount so the tapered end of the sensor
will point upstream and the sensor cable will
point downstream.
T
urn the ¼” adjusting nut
clockwise to e
x
pand the bracket and secure to
the pipe wall b
y
friction fit.
Insert the sensor into the mounting bracket and
tie wrap the sensor cable securel
y
to the
stainless steel pipe band.
FA
S
TEN
S
EN
SO
R
CABLE T
O P
I
P
E
O
R
CHANNEL WITH
TIE WRA
PS
S
EN
SO
R
END VIEW
V
SJ
H
AL
F-
P
I
P
E
M
OU
N
T
ING B
A
ND
ADJUSTMENT
JACK
SENSOR MOUNTING
BRACKET
END
BRACKET
FLOW