Ultra Tugger
®
10 Cable Puller and Pulling Packages
Greenlee Tools, Inc.
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
21
ASSEMBLY
Boom Assembly/Disassembly
Under normal circumstances, there is no need to disas-
semble the boom assembly. However, it can be disas-
sembled in order to fit into a small truck, mount the
puller head remotely on a floor mount, alter the boom
lengths, etc.
To disassemble, follow this procedure:
1. Lock the swivel caster brakes.
2. Pivot the elbow until the forward boom is clear of
the carriage.
3. Grab the nose by the hole at the end of the boom
tube, and lift up to relieve the preload on the detent
pins.
Ring Pull
Detent Pin
Grab
Point
4. Pull out on the detent ring that locks the boom tube,
and twist the nose slightly so the hole in the boom
tube and detent pin are misaligned.
Ring Pull
Detent Pin
5. Release the detent ring, and pull the nose and
forward boom from the elbow.
6. Repeat this process to remove the back boom
and elbow. Raise or lower the boom(s) as desired
beforehand to gain a comfortable position.
7. Turn the crank clockwise until the puller head is as
high as it will go.
8. Remove the clips and pull out the pins that mount
the puller head.
Puller
Mounting
Pins
9. Lift the puller head off the boom mount using as
many people as needed to lift 45 kg (100 lb).
Aside from detaching the other end of the two boom
tubes, this is as far as the unit breaks down. Assemble
in the reverse order, making sure that all detent pins are
fully seated before releasing your hold.