background image

30

SAFETY RELIEF VALVE [ Figure 2, Page 7 ]

Safety relief valve is required on your boiler. Water expands 

as it is heated. If there is no place for water to expand 

into, water pressure will build up inside boiler and system. 

Should this happen, safety relief valve will automatically 

open at predetermined pressure. This will relieve the strain 

on boiler and system. Run pipe from relief valve outlet 

(pipe must be same size as outlet and open end must not 

be threaded) to open drain, tub or sink, or other suitable 

drainage point not subject to freezing. Failure to do so may 

cause water damage or injury should safety relief valve 

release. 

EXPANSION TANK

Expanding water 

fl

 ows into expansion tank. Tank should 

be correct size. Tank is 

fi

 lled with air. As water expands it 

compresses air in the tank to form air pressure cushion. 

This “spring-like” cushion serves to maintain correct 

operating water pressure regardless of water temperature. 

This assures “full measure” of water, even in highest 

radiation unit of system. It also prevents blowing off of 

safety relief valve. Air in tank in beginning (with system 

fi

 lled with cold water) is suf

fi

 cient for proper operation. 

Tank also serves as trap for excess air in system. Air 

would cause gurgling in pipes and in ef

fi

 cient circulation in 

radiators if left in system.
It is possible for tank to become “waterlogged” (

fi

 lled 

with water). It can also become over

fi

 lled with air. This 

can happen after 

fi

 lling system with new water. Fittings 

provided on tank and in line to tank are for bleeding off 

excess water or air. 
When installing this tank, it is important: 

1. 

Tank be higher than boiler top. 

2. 

Pipe to tank continuously rises up to tank (so air 

can “bubble” up to it). 

DIAPHRAGM TYPE EXPANSION TANK

Diaphragm type expansion tank takes place of conventional 

expansion tank. Carefully read instructions packed with 

your tank assembly. 
Tank comes with 10-12 pounds per square inch air charge. 

This is the same as pressure produced in system by 

automatic 

fi

 ll valve. When system is 

fi

 rst 

fi

 lled, tank will 

contain little or no water. 
As water is heated its pressure increases. It expands into 

tank, compressing air in tank. Compressed air cushion 

permits water in system to expand as temperature 

changes. Diaphragm type tank can be mounted on air 

purger 

fi

 tting or at any convenient place in supply or return 

line.

AIR ELIMINATING FITTING (AIR PURGER)

Air purger is used to remove excess air from system. It 

is installed in supply line. It will eliminate air from water 

before it reaches radiators and bleed off this air.

MAIN AIR VENT FOR DOWN FLOW SYSTEMS OR 

DIAPHRAGM TYPE EXPANSION TANK

Before system is 

fi

 lled with water, there is air in pipes and 

radiation units. Some of it will be trapped as system is 

fi

 lled . It is possible to eliminate most of this air through 

air vent on radiation units. Main air vent will speed and 

simplify this. Install on highest point in supply main when 

all radiation is below top of boiler. 

AUTOMATIC FILL VALVE

For a safe, ef

fi

 cient operation, hot water system must be 

completely 

fi

 lled

 with water. Adding new water, when 

needed can be done manually (by use of hand valve in 

water supply line). Requires regular attention to system’s 

needs. Automatic 

fi

 ll valve accomplishes this without 

attention. Install in supply line on hot water boilers only. 

Valve operates through water pressure differentials. It does 

not require electrical connection.

DRAIN VALVE

Manual valve provides means of draining all water from 

boiler and system. It is often installed in 3/4” tapping at 

bottom of end boiler section. Or it can be installed in tee 

where return line enters boiler.

EQUIPMENT & OPTIONAL ACCESSORIES

WATER TEMPERATURE CONTROL

Water temperature limit control in relay is adjustable
and may be set as necessary. It may be set as low as 

140°F, or as high as 220°F. This depends on type and 

amount of radiation involved and weather conditions.

CIRCULATING PUMP

Every forced hot-water system requires circulating pump. 

Separate pump or zone valve is required for each zone, 

if you have a two or more zone system. Pump must have 

capacity to provide circulation required by your system. 

Pump is connected into main just ahead of boiler. It is also 

wired to electrical system.

BLOWER (Draft Inducer)

Blower provides means for pulling air through boiler and 

exhausting 

fl

 ue gasses into vent system. Blower shuts 

off when burners are not 

fi

 ring. This keeps heat in house 

rather than having it go up chimney.

 WARNING

Burn 

and scald hazard.  Safety relief valve could       

discharge steam or hot water during operation.       

Install discharge piping per these instructions

.

!

     

Summary of Contents for GMPVB

Page 1: ...VB Gas Fired Hot Water Induced Draft Boiler INSTALLATION OPERATION MAINTENANCE MANUAL Series II Models GMPVB 42 GMPVB 150 GMPVB 75 GMPVB 188 GMPVB 112 GMPVB 225 Manufactured by ECR International Inc 2...

Page 2: ...is boiler must be performed by a qualified installer TO THE INSTALLER Leave all instructions with boiler for future reference When this product is installed in the Commonwealth of Massachusetts the in...

Page 3: ...d be based upon Net AHRI Rating being equal to or greater than calculated heat loss of building Manufacturer should be consulted before selecting a boiler for installations having unusual piping and p...

Page 4: ...4 DIMENSIONS Model Width A GMPVB 42 11 GMPVB 75 14 1 4 GMPVB 112 17 1 2 GMPVB 150 20 3 4 GMPVB 187 24 GMPVB 225 27 1 4...

Page 5: ...ting installation See rating and capacity table 8 When installed in utility room door should be wide enough to allow largest boiler part to enter or to permit replacement of another appliance such as...

Page 6: ...s communicating directly or by ducts with outdoors Two Permanent Opening Method Provide opening commencing within 12 inches of top and second opening commencing within 12 inches of bottom enclosure Di...

Page 7: ...all be installed to relief valve outlet connection to avoid burns scalding or water damage due to discharge of steam and or hot water during operation Discharge line shall connect to relief valve outl...

Page 8: ...8 INSTALLATION SYSTEM PIPING Figure 3 Forced Hot Water Typical Piping Figure 4 Forced Hot Water Typical Piping With Zone Control Valve...

Page 9: ...exposed to refrigerated air circulation piping system shall be equipped with flow control valves or other automatic means to prevent gravity circulation of boiler water during cooling cycle INSTALLATI...

Page 10: ...as directly as possible with as few elbows as possible 7 Where possible it is recommended to common vent water heater and boiler Consult appropriate Vent Sizing Tables in National Fuel Gas Code for sp...

Page 11: ...n to gas vents or chimneys vent installations shall be in accordance with Venting of Equipment of the National Fuel Gas Code ANSI Z223 1 NFPA 54 or applicable provisions of the local building codes Fi...

Page 12: ...ng system Turn on any exhaust fans such as range hoods and bathroom exhausts so they will operate at maximum speed Do not operate a summer exhaust fan Close fireplace dampers 4 Place in operation the...

Page 13: ...eter 90 elbow or 3 feet of straight pipe for 3 diameter 90 elbow 2 3 4 5 Section Boilers use 3 vent pipe for 6 7 Section Boilers use 4 vent pipe CHOICE OF VENT PIPE MATERIAL U L Listed Z Flex Z Vent S...

Page 14: ...0 elbow pointing down fitted with a minimum 1 4 mesh screen to keep out rodents and birds The elbow shall be of the same material and size as vent pipe The elbow exit should be at least 6 away from ex...

Page 15: ...egulators and relief equipment See Figure 9 United States Terminate vent system at least 4 feet 1 22m horizontally from and in no case above or below unless a 4 feet 1 22m horizontal distance is maint...

Page 16: ...fore operating appliance B For Heat Fab Saf T Vent stainless steel vent pipe use a high temperature silicone sealant rated for 550 F The outside of the male end and inside of the female end of the pip...

Page 17: ...boiler to prevent collection of condensate throughout the assembly 7 Allow the sealant to cure for 24 hours before operating the appliance D For ProTech Systems FasNSeal stainless steel vent pipe no...

Page 18: ...ls Power Venter 2 3 4 5 SWG 4D 6 7 SWG 5D Some possible reasons for using a power venter for sidewall venting 1 May be preferred by local codes 2 Need a vent piping run beyond 30 9 1m but not more tha...

Page 19: ...g Install manual shut off valve in vertical pipe about 5 feet 1 5m above floor See Figure 10 Tighten all joints securely Propane gas connections should only be made by licensed propane installer Two s...

Page 20: ...pacity BTU Per Hour Input Includes Fittings 1 1 20 92 000 190 000 350 000 625 000 40 63 000 130 000 245 000 445 000 60 50 000 105 000 195 000 365 000 Table 6 PROPANE GAS Length of Pipe Ft Pipe Capacit...

Page 21: ...ot install a thermostat where it will be affected by drafts hot or cold pipes sunlight lighting fixtures televisions a fireplace or a chimney 4 Check thermostat operation by raising and lowering therm...

Page 22: ...er water temperature reaches high limit set point high limit contacts open cutting power to blower and pilot control Burners extinguish and blower stops Circulator pump continues to run as long as the...

Page 23: ...23 WIRING DIAGRAMS Figure 12 Control Module Damper is not an option...

Page 24: ...s Repeat until you have covered every radiation unit in system End at highest unit in system If units have automatic vents manual venting is unnecessary but it will speed up proper filling of system I...

Page 25: ...ob WARNING If you do not follow these instructions exactly a fire or explosion may result causing property damage personal injury or loss of life This appliance is equipped with an ignition device whi...

Page 26: ...quire primary air adjustment and are not equipped with primary air shutters Main burner flames form sharp blue inner cones in softer blue outer mantel with no yellow Puffs of air from blow ing on flam...

Page 27: ...supply to burners 3 Turn your thermostat up to call for heat and let your boiler run until temperature of water reaches limit setting Gas valve shuts off and circulator keeps running until thermostat...

Page 28: ...ater left in to freeze will crack pipes and or boiler Cleaning Your Boiler And Burners Flue passages between sections should be examined yearly and cleaned if necessary To clean Remove burners pilot a...

Page 29: ...trical contact Check all control terminals and wire joints Chimney flue is blocked Pressure switch will not close and pilot spark will not operate to start pilot Have your service technician check and...

Page 30: ...o expand as temperature changes Diaphragm type tank can be mounted on air purger fitting or at any convenient place in supply or return line AIR ELIMINATING FITTING AIR PURGER Air purger is used to re...

Page 31: ...ed Factory Pressure Switch Set point 0 4 wc for 2 5 section boilers 0 5 w c for 6 7 section boilers Rollout Switch FLAME ROLLOUT SAFETY SHUTOFF Rollout switch is temperature sensitive fuse link device...

Page 32: ...TT using wire nuts Ensure remaining Molex plug connectors have not worked loose during transit Check sensing bulb is fully inserted in well and is not loose A 3 Adjusting Settings To discourage unauth...

Page 33: ...ion was not detected and delay is called before retry Recycle delay Flame signal was lost and delay is called before retry 11 Wait for pressure switch to open failed to close Inducer is still off Pres...

Page 34: ...out models must be reset through key buttons and display On retry models wait for retry or reset at thermostat Check for correct installation and wiring before replacing any component Control module c...

Page 35: ...ut Soft lockout is reset after one hour if alarm reason disappears 63 Soft lockout maximum number of recycles exceeded Soft lockout 64 Soft Lockout electronics failure On board self diagnostics detect...

Page 36: ...ged wire Check for cracked ceramic insulator which can cause short to ground and replace igniter sensor if necessary At gas valve disconnect main valve wire from MV terminal Turn on power and set ther...

Page 37: ...Date Service Performed Company Name Tech Initials Company Address Phone...

Page 38: ...NOTES...

Page 39: ...Date Service Performed Company Name Tech Initials Company Address Phone...

Page 40: ...Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13504 4729 web site www ecrinternational com...

Reviews: