![Gree GVA24AL-K3NNC7A/I Service Manual Download Page 75](http://html1.mh-extra.com/html/gree/gva24al-k3nnc7a-i/gva24al-k3nnc7a-i_service-manual_2260413075.webp)
Service Manual
72
Installation and Maintenance
Procedure
Step
Remove 2 screws at the lower part, and then
pull the big front panel sub-assy downwards
slightly to remove it.
6.Remove big front panel sub-assy
Remove 3 screws at the top part of
the air-out panel, 2 screw at the lower
part and screws under the screw cover,
push the air-output panel upwards
slightly and then remove the air-output
panel.
5.Remove air-out panel
Screw
Screw
Air-out
panel
Big front panel sub-assy