Air-to-water Heat Pump
32
MONOBLOC TYPE
Fix
With
Bolts
Water Tank
Installed on the ground
and never suspended
The minimum clearance from the water tank to combustible surface must be 500mm.
There should be water pipe, hot water joint and floor drain near the water tank in favor of water replenishment,
hot water supply and drainage of water tank.
Connection of inlet/outlet waterway: Connect the safety check valve attached with the unit (with the arrow on it
pointing at the water tank) with the water inlet of water tank with PPR pipe according to the following figure, sealing
with unsintered tape. The other end of the safety check valve should connect with tap water joint. Connect the hot
water pipe and water outlet of water tank with PPR pipe.
Tap water
Safety check valve
Note
For safe use of water, water outlet/inlet of water tank must connect with a certain length of PPR pipe ,L
≥70×R
2
(cm, R is inside radius of the pipe). Moreover, heat preservation should be conducted and metal pipe
cannot be used. For the first use, water tank must be full of water before the power is on.
Summary of Contents for GRS-CQ12Pd/NhG-K
Page 2: ......
Page 24: ...Air to water Heat Pump 20 MONOBLOC TYPE 4 6 8kW Unit 10 12 14 16kW Unit ...
Page 62: ......
Page 84: ...Bomba de calor aire agua 20 4 6 8 kW Unidad 10 12 14 16 kW Unidad ...
Page 122: ......
Page 144: ...Pompe à chaleur air eau 20 Unité 4 6 8 kW Unité 10 12 14 16 kW ...