Contents
1 Safety Precautions ................................................................... 1
2 Outline of the Unit and Main Parts ........................................... 3
3 Preparative for Installation ....................................................... 4
3.1 Standard Accessory Parts .......................................................... 4
3.2 Selection of the Installation Location .......................................... 5
3.3 Connection Pipe Requirement ................................................... 7
3.4 Electrical Requirement ............................................................... 8
4 Installation of the Unit .............................................................. 9
4.1 Installation of the Indoor Unit ...................................................... 9
4.2 Installation of the Outdoor Unit ................................................. 12
4.3 Installation of the Connection Pipe ........................................... 14
4.4 Vacuum and Gas Leakage Inspection ...................................... 18
4.5 Installation of the Drain Hose ................................................... 20
4.6 The Panel Installation ............................................................... 25
4.7 Electrical Wiring ....................................................................... 27
5 Installation of Controllers ....................................................... 32
6 Test Running .......................................................................... 32
6.1 Trial Operation and Testing ...................................................... 32
6.2 Working Temperature Range ................................................... 33
7 Troubleshooting and Maintenance ......................................... 34
7.1 Troubleshooting ....................................................................... 34
7.2 Routine Maintenance ............................................................... 35