9
© Copyright, GREE Canada, 2021
© Copyright, GREE Canada, 2021
Note:
FOR SAFETY REASONS, ALL FOUR(4) SCREWS MUST BE SECURELY FASTENED.
Note:
Before installing unit, the top rail must be assembled on the unit.
Top Rail Hardware
Qty.
4
1
3/8” Screw
Top Rail
Step-By-Step
1) Remove the air conditioner from the carton and
place on a flat surface.
2) Remove top rail from the bottom of the packaging
material as shown in Fig. A
3) Tear off the paster at back side of sponge, and
then align it at the bottom edge of upper guide rail
to stick the sponge at the bottom of upper guide
rail. (The sponge has been stick on the upper guide
rail for some models. Therefore, this step can be
omitted.)
4) Align the hole in the top rail with those in the top of
the unit as shown in Fig. B
5) Secure the top rail to the unit with the 3/8”screws as
shown in Fig. C
Fig.
A
Fig.
B
Fig.
C
Packaging
Top Rail
Upper guide rail
Sponge