Great Plains Manufacturing, Inc.
Operating Instructions
63
04/09/2019
166-283M
Storage
Store the drill where children do not play. If possible,
store inside for longer life.
1. Unload all material in hoppers. See “
2. Raise, fold and lock implement (page 35 and
page 30). For unfolded storage, see steps at right.
3. Unlatch the hopper lids so that the seals are not in
compression during storage. Route a chain or secu-
rity cable through the hold-down U-bolt and the latch
handle to prevent unauthorized entry, and prevent
high winds from opening the lid.
4. Empty the hoppers completely. Hand crank the
meters several turns to empty completely. See “
out the meters with air to remove all material.
5. Perform Parking checklist (page 62), except for
6. If equipped with optional air/hydraulic brake system,
drain water from reservoir (page 123).
7. Remove the drive chains and store in oil.
8. Lubricate the drill at all points listed under “
tion and Scheduled Maintenance
9. Check all bolts, pins, fittings and hoses. Tighten,
repair or replace parts as needed.
10. Check all moving parts for wear or damage. Make
notes of any parts needing repair or replacement
before the next season.
11. Open the meter-box doors completely to release
seal pressure and allow rinse water to exit.
12. Thoroughly wash the hoppers with water to prevent
corrosion from fertilizer or seed treatments.
13. Set doors to slightly open, but not wide enough for
animals to enter the meters. Wire doors in place if
needed. Do not store the drill with seals com-
pressed.
14. Raise and latch the ladders, to discourage climbers.
15. Lubricate all points listed in Maintenance to prevent
rust.
16. Clean air drill of mud, dirt, excess oil and grease.
17. Grease exposed cylinder rods to prevent rust.
18. Use touch-up paint to cover scratches, chips and
worn areas to prevent rust.
MetaData: End of Operating Instructions
Unfolded Storage
See page 107 for details on maintenance lock.
2a. Raise and unfold implement.
2b. Install gauge wheel lock channels.
2c. Initiate a fold, just until center lock engages.
2d. Lower implement onto lock channels.
2e. Set all hydraulic remotes to Float.