![GREAT PLAINS 3S-3000HD Operator'S Manual Download Page 3](http://html1.mh-extra.com/html/great-plains/3s-3000hd/3s-3000hd_operators-manual_2259383003.webp)
Great Plains Manufacturing, Inc.
iii
2019-03-12
195-068M
©
Copyright 2006, 2007, 2008, 2009, 2010, 2012, 2013, 2014, 2019 All rights Reserved
Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been
taken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed
for damages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products
as it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.
Trademarks of Great Plains Manufacturing, Inc. include: AccuShot, Max-Chisel, Row-Pro,
Singulator Plus, Short Disk, Swath Command, Terra-Tine, Ultra-Chisel, and X-Press.
Registered Trademarks of Great Plains Manufacturing, Inc. include: Air-Pro, Clear-Shot, Discovator, Great Plains, Land Pride, MeterCone,
Nutri-Pro, Seed-Lok, Solid Stand, Terra-Guard, Turbo-Chisel, Turbo-Chopper, Turbo-Max, Turbo-Till, Ultra-Till, Whirlfilter, and Yield-Pro.
Brand and Product Names that appear and are owned by others are trademarks of their respective owners.
Printed in the United States of America
Table of Contents
Important Safety Information ......................................1
Safety Decals .................................................................6
Introduction ................................................................12
Document Family .........................................................12
Description of Unit ........................................................12
Intended Usage ........................................................12
Models Covered .......................................................12
Using This Manual........................................................13
Definitions.................................................................13
Owner Assistance ........................................................14
Preparation and Setup ...............................................15
Pre-Setup Checklist......................................................15
Hitching ........................................................................15
Electrical Connections..................................................17
Hydraulic Hose Hookup................................................18
Check Drill Level ..........................................................19
Setting the Bypass Valve .............................................20
Operating Instructions...............................................22
General Description......................................................22
Pre-Start Checklist .......................................................23
Raising and Lowering Openers ....................................23
Opener Lock Up .......................................................23
Lock Up Openers..................................................23
Unlock Openers....................................................24
Folding..........................................................................24
Raising Drill (Transport Lift)..........................................25
Transport Lift ............................................................26
Transport ......................................................................26
Weights for Tractor Requirements............................27
Marker Transportation ..............................................27
Transport Checklist ..................................................27
Lowering Drill (Transport Lift) .......................................28
Transport Lower .......................................................28
Unfolding ......................................................................29
Folding and Unfolding Quick Reference...................30
To Fold Drill for Transport.....................................30
To Unfold Drill for Field.........................................30
Opener Operation.........................................................31
Active Hydraulic Systems.........................................32
Priority Flow Hydraulic Systems ...............................33
Non-Active Hydraulic System ...................................33
Position Seed Cup Doors .........................................34
Loading Seed Boxes ....................................................34
Main Seed Box Loading ...........................................35
Small Seeds Box Loading........................................ 35
Seeding with Both Compartments ........................... 35
Fertilizer Box Operation ............................................... 36
Seeding and applying fertilizer ................................. 36
Divided Capacities ............................................... 37
Divider Removal................................................... 37
Initial Seeding Depth ................................................ 39
Acremeter Operation.................................................... 40
Normal Operating Sequence ................................... 40
Dormant Display................................................... 41
Marker Operation ......................................................... 42
Single Marker Operations ........................................ 42
Dual Marker Operations........................................... 42
Lift Selector Valve Operation ....................................... 43
Point Row Operation.................................................... 43
Shaft Monitor Operation............................................... 44
Field Operations........................................................... 44
Planting Speed..................................................... 44
Parking......................................................................... 45
Parking with Drill Unfolded ....................................... 45
Parking with Drill Folded .......................................... 45
Storage ........................................................................ 46
Adjustments ............................................................... 47
Seed and Fertilizer Rate ...................................... 47
Planting Depth...................................................... 47
Setting Material Rates.................................................. 48
Setting Main Box Seed Rate .................................... 48
Calibration ............................................................ 48
Setting Fertilizer Rate .............................................. 48
Small Seeds Rate .................................................... 48
Frame Level ................................................................. 49
Frame Weight .............................................................. 50
Opener Frame Down-Force ......................................... 50
Setting Hydraulic Down-Pressure ............................ 52
Opener-Subframe Adjustment ..................................... 53
Row Unit Adjustments.................................................. 54
Opener Height.......................................................... 55
Row Unit Down Pressure (Spring) ........................... 55
Disk Blade Adjustments ........................................... 56
Adjusting Disc Contact ......................................... 56
Disk Scraper Adjustments........................................ 56
Seed Firmer Adjustments ........................................ 57