PREFACE

This manual is provided to prevent service personnel from committing an act 

that results in the risk of fire, electric shock, or injury to persons. Only trained 

service personnel should receive, unpack, and assemble the Vertical Cable 

Manager (VCM). In addition, only trained service personnel should manage 

cables in the VCM.

SAFETY SYMBOLS USED IN THIS MANUAL

This manual provides general safety guidelines to be observed during 

installation, operation, and maintenance of the VCMs.

WARNING:

Failure to follow directions in the warning could result in injury to persons or 

loss of life.

Improper handling and use of the VCM could result in equipment damage, 

serious injury, or possible death.

Only UL® Listed ITE (Information Technology Equipment) cable should be 

managed with the VCM.

Be sure to read and follow all individual manufacturer equipment manuals for 

safety and installation instructions.

Proper spacing is required when installing electrical equipment to avoid 

electrical shock. 

5" VERTICAL CABLE MANAGER 

MOUNTING BRACKETS

There are two sets of 4 brackets that will allow you to mount the 

cable management channels in multiple ways. Each bracket set 

is compatible with different racks - ensure that the brackets that 

are being used are the correct brackets for the rack. In addition, 

bracket sets will allow VCMs to be mounted to the front or back 

of rack uprights; however, some racks can only accept mounting 

to the front of the upright. 

PARTS LIST: VCM5-FO & VCM5-FR 

COMPONENTS AND QUANTITIES ARE THE SAME FOR 

 

VCM5-FO AND VCM5-FR, EXCEPT WHERE SPECIFIED

 COMPONENT 

   

QTY.

  VCM5-FO CHANNEL OR VCM5-FR CHANNEL     

2

  5" CHANNEL COVERS 

   

 VCM5-FO: 2; VCM5-FR:4 

  BRACKET SET “A1” 

(BRACKETS ARE INSTALLED ON CHANNEL BY DEFAULT)

 4

  BRACKET SET “A2” 

   

4

  #12-24 SCREWS  

   

  #8-32 X 1/2" SCREWS 

   

 16

 

   INSTRUCTION MANUAL 

   

1

TOOLS REQUIRED: 3/8" NUT DRIVER, PHILLIPS HEAD SCREWDRIVER

Summary of Contents for VCM5-FR

Page 1: ...VCM5 FR VCM5 FO 5 Vertical Cable Management Accessories Installation Instructions 1 866 TRY GLCC 879 4522 WeRackYourWorld com...

Page 2: ...idual manufacturer equipment manuals for safety and installation instructions Proper spacing is required when installing electrical equipment to avoid electrical shock 5 VERTICAL CABLE MANAGER MOUNTIN...

Page 3: ...t to the front or back side of upright 4PM6 VCM must mount to front of upright 4PHD29 VCM must mount to front of upright MOUNTING BRACKET SET A1 MOUNTED TO THE FRONT OF THE UPRIGHT MOUNTING BRACKET SE...

Page 4: ...ackets with the equipment rack Figure 1 2 To secure the channel in place push the supplied 12 24 screws through the mounting bracket and screw into the equipment rack 3 When assembling the 80 channel...

Page 5: ...CK OF THE UPRIGHT MOUNTING BRACKET SET A2 TOWARDS THE FRONT OF THE UPRIGHT BRACKET SET A2 DETAIL A DETAIL A DETAIL A VCM5 5 13 5 44 5 13 19 SHOWN AT EXTENDS TO 2 19 3 09 SHOWN AT RECESS TO 5 09 93 2 9...

Page 6: ...rack 3 To secure the channel section screw the supplied 12 24 screws through the mounting bracket into the desired holes in the equipment rack and tighten NOTE Use cage nut hardware supplied with your...

Page 7: ...IA standards Cable Retainer VCM5 CR The Cable Retainer is designed to hold cable within the channel The Cable Retainer has four notches so it can be snapped off to accommodate different size slotted d...

Page 8: ...components during a lightning storm 2 Never install components in wet locations unless the components are designed specifically for use in wet locations 3 Never touch uninsulated wires or terminals u...