background image

6

FIGURE 4

FIGURE 3

 VCM  

 VCM  

INSTRUCTIONS FOR BRACKET SET A2 

1. 

Remove bracket set A1. Based on 

the rack that is being used, determine 

if the VCM will mount to the front or 

rear of the upright. Front or rear mounting 

will determine correct orientation of 

bracket set A2 (see page 5 for details). 

Once orientation is determined, secure the 

brackets (2 per each 40" section) to the VCM 

by using the supplied #8-32 screws (Figure 3). 

Verify bracket is securely fastened into place.

NOTE:

 All provided brackets must be installed 

on the same side of the channel.

2.

  Hold the first channel section in the desired location of the 

equipment rack, align the bracket to the appropriate mounting 

holes located on either the front/back side of the rack.

3.

  To secure the channel section, screw the supplied #12-24 

screws through the mounting bracket into the desired holes in the 

equipment rack and tighten. 

NOTE: Use cage nut hardware supplied with your square hole 

uprights for those applications.

4.

  To mount the second section, carefully align the 

tabs on the two sections (Figure 4) and attach 

to the upright. 

5.

  Snap the supplied covers on the 

pre-determined fingers for cable security and 

to maintain a clean installation. 

NOTE: The channel fingers can be bent outward 

and snapped off to more easily run cables from the 

vertical to the horizontal channel.

OPTIONAL MOUNTING:

Connect the top and bottom of the cable management section. 

Install all 4 mounting brackets. Next hold up to rack and pencil 

mark the holes you need to secure VCM5F* to rack. Remove the 

brackets and install them unto the rack. Finally attach to cable 

management to rack by using #12-24 screws.

#12-24

#8-32

Summary of Contents for VCM5-FR

Page 1: ...VCM5 FR VCM5 FO 5 Vertical Cable Management Accessories Installation Instructions 1 866 TRY GLCC 879 4522 WeRackYourWorld com...

Page 2: ...idual manufacturer equipment manuals for safety and installation instructions Proper spacing is required when installing electrical equipment to avoid electrical shock 5 VERTICAL CABLE MANAGER MOUNTIN...

Page 3: ...t to the front or back side of upright 4PM6 VCM must mount to front of upright 4PHD29 VCM must mount to front of upright MOUNTING BRACKET SET A1 MOUNTED TO THE FRONT OF THE UPRIGHT MOUNTING BRACKET SE...

Page 4: ...ackets with the equipment rack Figure 1 2 To secure the channel in place push the supplied 12 24 screws through the mounting bracket and screw into the equipment rack 3 When assembling the 80 channel...

Page 5: ...CK OF THE UPRIGHT MOUNTING BRACKET SET A2 TOWARDS THE FRONT OF THE UPRIGHT BRACKET SET A2 DETAIL A DETAIL A DETAIL A VCM5 5 13 5 44 5 13 19 SHOWN AT EXTENDS TO 2 19 3 09 SHOWN AT RECESS TO 5 09 93 2 9...

Page 6: ...rack 3 To secure the channel section screw the supplied 12 24 screws through the mounting bracket into the desired holes in the equipment rack and tighten NOTE Use cage nut hardware supplied with your...

Page 7: ...IA standards Cable Retainer VCM5 CR The Cable Retainer is designed to hold cable within the channel The Cable Retainer has four notches so it can be snapped off to accommodate different size slotted d...

Page 8: ...components during a lightning storm 2 Never install components in wet locations unless the components are designed specifically for use in wet locations 3 Never touch uninsulated wires or terminals u...

Reviews: