How to Assemble Your Guillotine Tower - pg. 2
IMPORTANT NOTE: Two people are required to install your Guillotine.
Gratz Industries is not responsible for any damages to the Guillotine that is caused by improper opening, set up or installation. Please email [email protected] for any inquiries.
STEP 2 - Connecting Vertical Beams
Two people are required. Connect the vertical beam with the
Support Cross Beam and Guillotine Fixed Bar attached to the
other Vertical Beam. Screw and tighten.
STEP 3 - Connecting Floor Plate
Keep vertical beams level. Locate the floor plate and screws (
Figure C
). Align
hole of floor plate to holes on the base of vertical beams. Carefully hold the plate
secure to base of beams while you fasten them together with the screws given.
STEP 4 - Connecting Padded Sling Bar
(
Figure D
). Locate the Allen key and Padded Sling Bar. (
Figure E
). Using the given
Allen key, remove screws located at the bottom of the glides on the inside of the
vertical beams. (
Figure F
). Insert Padded Sling Bar onto the glides (
Figure G
).
Insert and tighten screws at the bottom of the glides.
Figure C
Figure D
Figure E
Figure F
Figure G