How to Assemble Your Guillotine Tower
What Comes in the Box
IMPORTANT NOTE: Two people are required to install your Guillotine.
Gratz Industries is not responsible for any damages to the Guillotine that is caused by improper opening, set up or installation. Please email [email protected] for any inquiries.
What You Will Need:
Scissors
(2) Vertical Beams
(1) Support Cross Beam
(1) Guillotine Fixed Bar
(1) Floor Plate
(2) Leg Springs
(2) Guillotine Springs
(1) Folding Mat
(1) Padding Sling Bar Assembly
(2) Sheepskin Loops
(2) Loops
(2) Metal and Wood Handles
(2) Guillotine Mounting Angles
(1) Hardware Pack
(2) Arm Springs
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
STEP 1 - Remove
Contents from Box
Two People
Drill
Screws
*
IMPORTANT
: Gratz has included screws
for your convenience. Gratz does not have
knowledge of of your studio's wall or floor
contruction, so please consult with your
Contractor or Handyman before
using the supplied hardware.
Leveling
Square
Allen Key
1/4
Allen Key
3/16
These Tools are Included
Locate the 2 vertical
beams and lay them
down next to each
other facing up and
eye hooks on top
(
Figure A
)
Next, screw one side
of the Support Cross
Beam (
B
) and the
Guillotine Fixed
Bar (
C
) to one of
the vertical beam
(
Figure B
)
1/2” Phillips
(4) 1/2”
Crosspiece
Screws
Used to
attach mat
to base
plate.
Screw #1
Screw #2
Screw #3
Screw #4
Screw #5
(16) 1”
Self tapping
used to
attach top
brackets to
Guillotine.
(34) 1
1/4”
To connect
top bracket
to ceiling
& base to
ground.
(8) 1/4 -
20 x 1”
Socket Head
Use to attach
to baseplate
to uprights.
(2) 5/16 -
(18) 3/8”
Socket Head
For the sliding
bar track. Slide
in bar and
then screw
in screws.
Figure A
Figure B