background image

How to Assemble Your Guillotine Tower

What Comes in the Box

IMPORTANT NOTE: Two people are required to install your Guillotine.

Gratz Industries is not responsible for any damages to the Guillotine that is caused by improper opening, set up or installation. Please email [email protected] for any inquiries.

What You Will Need:

Scissors

(2) Vertical Beams
(1) Support Cross Beam
(1) Guillotine Fixed Bar
(1) Floor Plate
(2) Leg Springs
(2) Guillotine Springs
(1) Folding Mat
(1) Padding Sling Bar Assembly
(2) Sheepskin Loops
(2) Loops
(2) Metal and Wood Handles
(2) Guillotine Mounting Angles
(1) Hardware Pack
(2) Arm Springs

A.
B.

C.
D.

E.

F.

G.
H.

I.

J.

K.

L.

M.

N.

STEP 1 - Remove 

Contents from Box

Two People

Drill

Screws

*

IMPORTANT

: Gratz has included screws

for your convenience. Gratz does not have

knowledge of of your studio's wall or floor 

contruction, so please consult with your

Contractor or Handyman before

using the supplied hardware. 

Leveling

Square

Allen Key

1/4

Allen Key

3/16

These Tools are Included

Locate the 2 vertical

beams and lay them

down next to each

other facing up and 

eye hooks on top

(

Figure A

)

Next, screw one side

of the Support Cross

Beam (

B

) and the

Guillotine Fixed

Bar (

C

) to one of

the vertical beam

(

Figure B

1/2” Phillips

(4) 1/2”

Crosspiece

Screws

Used to

attach mat

to base

plate.

Screw #1

Screw #2

Screw #3

Screw #4

Screw #5

(16) 1”

Self tapping

used to

attach top

brackets to

Guillotine. 

(34) 1 

1/4”

To connect

top bracket

to ceiling

& base to

ground. 

(8) 1/4 -

20 x 1”

Socket Head 

Use to attach

to baseplate

to uprights. 

(2) 5/16 -

(18) 3/8”

Socket Head

For the sliding

bar track. Slide 

in bar and

then screw

in screws. 

Figure A

Figure B

Reviews: