Board Location Guide
PDR 100 Fibre Channel Installation
43
Example 1
This example shows how to use the Board I/O Requirements and Restrictions,
Table 3, and the Board Location Chart, Table 4, to install a Fibre Channel upgrade
into a 4-channel PDR100 with two Serial I/O boards and four Audio I/O boards.
In all likelihood, you will have to move boards before you can install the Fibre
Channel upgrade. Move the boards before using the Board Location Chart. For this
example:
1. Move the Serial I/O in slot J8 to slot J7.
2. Move the Audio I/O board in slot J9 to slot J8.
3. Move the Audio I/O board in slot J10 to slot J9.
4. Move the Serial I/O in slot J11 to slot J10.
5. Move the Audio I/O board in slot J12 to slot J11.
6. Move the Audio I/O board in slot J13 to slot J12.
7. Now fill in the Board Location Chart.
a. For the Serial I/O in slot J7, which requires two inputs and two outputs:
- Write Serial I/O in Slot 7.
- Put check marks in the 1 and 2 Input blocks for J7.
- Put check marks in the 1 and 2 Output blocks for J7.
b. For the Audio I/O boards in slots J8 and J9, which require no Video Router
connections:
- Write Audio I/O in Slot J8 and Slot J9.
c. For the Serial I/O in slot J10, which requires two inputs and two outputs:
- Write Serial I/O in Slot 10.
- Put check marks in the 1 and 2 Input blocks for J10.
- Put check marks in the 1 and 2 Output blocks for J10.
d. For the Audio I/O boards in slots J11 and J12, which require no Video
Router connections:
- Write Audio I/O in Slot J11 and Slot J12.