xvi
About High Line (208V-240V) Versus Low Line (120V) Operations ............................ 36
Power Supply Frame Rack Installation and Airflow.......................................................... 44
Standard Power Cooling ............................................................................................................ 45
Supplied Power Cables for 15-RU ........................................................................................... 45
About High Line (208V-240V) Versus Low Line (120V) Operations ............................ 46
About Low Line (120V) Operational Considerations ....................................................... 46
3
System Cabling ...................................................................... 47
Summary of Contents for GV K-FRAME XP
Page 1: ...GV K FRAME XP VIDEO PRODUCTION FRAMES Installation Planning Guide 13 06166 000AB 10 15 21 ...
Page 18: ......
Page 40: ...Frame Installation 40 15RUVideo Processor Views 15 RU Front View withDoor Removed ...
Page 41: ...GV K Frame XP Installation Planning Guide 41 15 RU Rear ViewIP Gearbox Conversion ...
Page 43: ...GV K Frame XP Installation Planning Guide 43 PowerSupplyFrameDimensions TopView ...