29
Arm
Supported Control Protocols
separate switchers sharing one Frame. See the K-Frame Installation & Service Manual for
suite configuration information.
Supported Control Protocols
•
PBus II
•
GPI Inputs and Outputs
•
Serial BVW-75 for VTR control
•
Odetics protocol for VTR control
•
AMP (advanced media protocol) for Profile PVS, Profile XP Media Platform, K2, M-Series,
Turbo iDDR, and T2 iDDR systems over Ethernet
•
Grass Valley Native Protocol for routers/routing control systems (Trinix/Trinix NXT,
Venus™, Triton™, and third-party routers; Jupiter NV9000 and NV920, and Encore router
control systems)
•
Tally (contact closure)
6600_05
Summary of Contents for GV K-FRAME XP
Page 1: ...GV K FRAME XP VIDEO PRODUCTION FRAMES Installation Planning Guide 13 06166 000AB 10 15 21 ...
Page 18: ......
Page 40: ...Frame Installation 40 15RUVideo Processor Views 15 RU Front View withDoor Removed ...
Page 41: ...GV K Frame XP Installation Planning Guide 41 15 RU Rear ViewIP Gearbox Conversion ...
Page 43: ...GV K Frame XP Installation Planning Guide 43 PowerSupplyFrameDimensions TopView ...