background image

www.GrapeSolar.com

 

Tel.  1

-

877

-

264

-

1014 (toll free), 1

-

541

-

349

-

9000                          

 

 

Document Version 200722

 

©Copyright 2019, Grape Solar, Inc. All Rights Reserved

 

600 Watt MPPT Off

-

Grid Charging Kit

 

(GS

-

600

-

KIT

-

MPPT)

 

Quick Connect Guide

 

 

IMPORTANT

: Please read GS

-

MPPT

-

Zenith

-

40 charge 

 

controller owner

s manual and GS

-

STAR

-

200W Connection 

Guide (included with products) before assembling kit.

 

 

For additional information about Grape Solar products: 

 

email 

[email protected]

, or 

 

1

 

Check your order to make sure that all parts are included: 

 

 

GS

-

MPPT

-

Zenith

-

40 Charge Controller

 

 

3x 

20

-

Amp MC4 In

-

Line Fuse

 

 

2x 

MC4 Branch Connector Set

 

 

3x 

GS

-

 

STAR

-

200W Solar Panel

 

 

5

-

ft. Red/Black 10 AWG Cable Pair

 

 

2x 

15

-

ft. MC4 Cable

 

 

6

-

in. Red/Black MC4

-

to

-

Bare Wire Pair

 

 

 

Additional tools and equipment you will need:

 

         ◦

Screwdriver–

 

Philips Head          

   

 

         ◦12

-

Volt Deep

-

Cycle Battery Bank       

 

Voltmeter (for Troubleshooting)

 

 

 

x3

 

 

x2

 

x2

 

 

 

 

x3

 

 

To estimate how much average monthly 

power this system should produce in your 

area, please use the 

PV Watts Calculator 

found at:

 

 

https://pvwatts.nrel.gov/

 

 

This System Size= 0.60 kW DC

 

 

(only applicable for zip codes in the U.S.A.)

 

 

[

The Quick Connect Guide diagrams are not to scale

.

]

 

GS

-

600

-

KIT

-

MPPT PHOTOVOLTAIC 

 

POWER GENERATION SYSTEM

 

QUICK CONNECT GUIDE Rev. 200722

 

Summary of Contents for GS-600-KIT-MPPT

Page 1: ...d GS MPPT Zenith 40 Charge Controller 3x 20 Amp MC4 In Line Fuse 2x MC4 Branch Connector Set 3x GS STAR 200W Solar Panel 5 ft Red Black 10 AWG Cable Pair 2x 15 ft MC4 Cable 6 in Red Black MC4 to Bare Wire Pair Additional tools and equipment you will need Screwdriver Philips Head 12 Volt Deep Cycle Battery Bank Voltmeter for Troubleshooting x3 x2 x2 x3 To estimate how much average monthly power thi...

Page 2: ...re made during daylight cover the panels with cardboard cloth or a similar opaque material so that the panel does not output power Connect the bare wire end of the 10 AWG thinner red battery cable to the battery terminal on the bottom of the charge controller Connect the bare wire end of the 10 AWG thinner black cable to the battery terminal A Phillips head screwdriver can be used to loosen and ti...

Page 3: ...e wire ends of the MC4 to Bare Wire pair to the charge controller The red wire connects to the input and the black wire connects to the input Remove the panel covering In good sunlight the charge controller s BAT should increase to 100 When the controller is set to LOAD ON the system will provide power through the load control output or through the USB port 7 9 Connect the 15 ft MC4 cables to the ...

Page 4: ... Installations of this kit could be subject to national and local building and electrical codes Installers should have adequate knowledge of national and local code to ensure the installation passes inspection by the local electric authority Proper fuses or breakers should be used to comply with all local and national codes Contact Grape Solar for specific recommendations All batteries used for th...

Reviews: