OPERATING THE CRAFT
45
Golden Line G850 Owner’s Manual
Begin the inflation procedure according to the sequence shown in figure 11. Initially, partially inflate
each chamber (approx. 0.1 bar (1.45 psi) then repeat the procedure inflating each chamber to its
nominal pressure, 0.15 bar (2.15 psi).
The nominal pressure is 0,15 bar (2,15 psi).
Fig. 11. Tube inflation sequence.
Check the pressure in each chamber with a pressure gauge. If you do not have a pressure gauge
the following procedure will serve as a guide. Press a finger firmly against the tube – if the tube is
depressed by about 10 mm (⅜ inch) this indicates that the pressure is approximately correct.
After the tube chambers have been inflated to the nominal pressure replace the valve caps. Fit the
caps to the valve body and turn clockwise until secure.
Summary of Contents for Golden Line G850
Page 1: ...Not...
Page 2: ...CONTENTS...
Page 3: ......
Page 4: ...CONTENTS...
Page 58: ...OPERATING THE CRAFT 58 LOCATION OF BILGE PUMP Fig 22 Bilge pump location Bilge pump...
Page 70: ...OPERATING THE CRAFT 70 WATER SYPPLY SYSTEM IF APPLICABLE Fig 34 Water supply system...
Page 76: ...OPERATING THE CRAFT 76 REAR SIDE ROPE HATCHES Fig 38 Rear side rope hatches Rope hatches...
Page 100: ...TECHNICAL DETAILS 100 LOADING PASSENGERS Fig 55 Recommended seating arrangement for 12 persons...
Page 115: ...FOR YOUR NOTES...
Page 116: ......
Page 117: ......