24” - 30” Fire Pit Inserts
Standard Line Automated Operation
Page 9
CONTROL PANEL
(TYPICALLY MOUNTED WITH
POOL EQUIPMENT UP TO 150 FEET
AWAY FROM BURNER)
GAS INLET
GAS
OUTLET
24 VAC OUTPUT & CONDUIT (UNDERGROUND)
COMMERCIAL SAFETY PIPE TRAIN
SUPPLIED BY GRAND EFFECTS
(INSTALL AS CLOSE AS POSSIBLE
TO FIRE PIT)
120 VAC 60HZ INPUT
TO CONTROL PANEL
MANUAL GAS
VALVE
JUNCTION BOX
24 VAC
24 VAC
1” NPT GAS PIPING (UNDERGROUND)
KEYED SWITCH*
KILL SWITCH*
24 VAC 60 HZ INPUT DETAILS
LEAKAGE TEST
PORT
*SUPPLIED BY OTHERS
Figure 4. Commercial Installation
3. The piping must be reduced to 3/4″ NPT or larger at the burner, as
shown in Figure 5, 6 and 7.
4. At each burner, install a 90° gas pipe elbow on the gas line for proper
installation of a gas hose. Do not kink or make a tight radius bend on
the gas hose.
IMPORTANT:
Do not come straight up with the gas hose. As shown in
Figure 5, 6 and 7, a 90° gas pipe elbow must be installed
on the gas line for proper installation of the gas hose. The
product warranty is voided if it is not installed with an elbow.
X1
X2
GRD
1 “GAS BALL VALVE
OR KEYED VALVE
INSTALLED ON
FIRE PIT
1” NPT
GAS INLET
REDUCE
TO 3/4”
DRAIN
SUPPORT
THREADED ROD
REMOVE EXCESS
AFTER INSTALLING NUT
FIRE PIT WALL
2.5” DIA. (4)
MULTIPLE VENTS
REQUIRED
TO GRAND EFFECTS
®
CONTROL PANEL
18” MIN.
2”
Figure 5. Natural Gas - Residential Installation