Page 8
24” - 30” Fire Pit Inserts
Standard Line Automated Operation
1. Install the control panel and gas piping as shown in Figure 2: Natural
Gas, Figure 3: Propane Gas, or Figure 4: Commercial Installation. Gas
lines must be clean and free from any dirt, debris, or contamination.
Note:
Piping and fire pit construction are different for natural gas and
propane gas.
2. The gas piping must be installed underground between the control
panel and each burner, as shown in Figure 2, 3 and 4.
GAS INLET
CONNECTION
MANUAL GAS
VALVE
120 VAC 60HZ INPUT
TO CONTROL PANEL
CONTROL PANEL
(TYPICALLY MOUNTED WITH
POOL EQUIPMENT UP TO 150 FEET
FROM BURNER)
2 VAC OUTPUT & CONDUIT (UNDERGROUND)
1” NPT GAS PIPING (UNDERGROUND)
Figure 2. Natural Gas
CONTROL PANEL
(TYPICALLY MOUNTED WITH
POOL EQUIPMENT)
GAS INLET
(PROPANE)
GAS
OUTLET
24 VAC OUTPUT & CONDUIT (UNDERGROUND)
1” NPT GAS PIPING (UNDERGROUND)
PROPANE ADDER
SUPPLIED BY GRAND EFFECTS
®
INSTALLED AS CLOSE AS
POSSIBLE TO FIRE PIT
120 VAC 60HZ INPUT
TO CONTROL PANEL
MANUAL GAS
VALVE
JUNCTION BOX
24 VAC
24 VAC
LEAKAGE TEST
PORT
Figure 3. Propane Gas