13
Switch Operation
Blocked vent switches are flue gas safety devices for detecting spillage of flue gases due to a blocked
flue or inadequate draft. After detecting a problem, the switch de-energizes the system’s burner
control.
NEVER reset the switch unless the cause of the blockage has been corrected.
Installation
1)
Drill a 5/8” hole in to the flue vent pipe near the appliance breech connection.
2)
This hole must be before the draft regulator, vertically or horizontally.
3)
Remove one of the securing nuts from the threaded tube of the safety switch.
4)
Tighten the other securing nut onto the pipe as far as possible (Figure 1).
5)
Insert the threaded tube end into the pierced hole of the flue vent pipe.
6)
Install the securing nut on the safety switch tube, which protrudes into the flue vent
pipe. Tighten the nut securely (Figure 1).
Figure 1 -
Illustration Granby Industries
Figure 2 -
BVSO wiring diagram
Wiring Instructions (BVSO)
Caution:
Disconnect the electrical power when wiring the unit.
Wire the blocked vent switch in accordance with The National Electrical Code and applicable local
codes. Wire the safety switch (BVSO) in series with the thermostat and the fan timer relay
control (Figure 2).
System Test Procedure (BVSO)
1. 1)With the power re-established, block the chimney or vent pipe downstream of the switch.
2. 2)Adjust the thermostat to call for heat.
3. 3)Once the heating system has started the blocked vent switch should shut down the burner
within 10 minutes or sooner.
4. 4)Once the system has cooled, the blocked vent switch can manually be reset.
5. 5)This procedure should be tested a second time.
6. 6)After testing the blocked vent switch the chimney should be cleared of obstruction and the
heating system should be tested over a long run cycle.
If the block vent switch shuts down the system, check to ensure there is enough draft in the
chimney and venting pipes.
Summary of Contents for KLF-100
Page 7: ...7 KLR 200 DIMENSIONS Dimensions are in inches KLF 100 DIMENSIONS Dimensions are in inches...
Page 22: ...22 Position of the ST9103A1028 Electronic Board KLR 100 and 200 KLF 100 KLF 200...
Page 28: ...28 8 0 ELECTRICAL WIRING DIAGRAMS HEATING COOLING KLR KLF RIELLO...
Page 29: ...29 HEATING COOLING For more informations see next page...
Page 30: ...30 GeniSys control schematic with the ST9103 Board...
Page 31: ...31 HEATING ONLY RIELLO BECKETT...
Page 34: ...34 KLR 200 EXPLODED PARTS VIEW Detail A ELB A0 0008 00 Electric box...