
8
STEP 6 CONTROL SENSOR ATTACHMENT
Prior to jacket top and front panel installation the control sensor must be inserted into the brass
well located on the top of the boiler and secured by a clip. Feed the sensor through the hole
on the front of the right side panel from the outside. Penetrate the block insulation to insert the
sensor. The sensor must be fully inserted to the bottom of the well.
STEP 7 TOP AND FRONT PANEL ATTACHMENT
Affix the top panel by placing the holes located on the underside of the panel over the jacket
affixing pins. Press down on the top panel and it will snap in place. Affix the lower front panel
by placing the openings on the lips of the panel over the jacket affixing screws and pushing
downward on the panel. The panel will lock in place. Repeat the process for the top front
panel.
Upon completion of the jacket assembly the Honeywell control can be mounted on the
side of the boiler. (Left or right)
Boiler control
Manual
Air Vent