
Shutdown
NOTICE
Proper system setup, startup, and shutdown
procedures are critical to electrical equipment
reliability. The following procedures ensure steady
voltage. Failure to follow these procedures will
cause voltage fluctuations that can damage
electrical equipment and void the warranty.
1. Press
to stop the pumps.
2. Turn off all heat zones.
3. Relieve pressure. See
Pressure Relief Procedure, page 49
.
4. Press
to park the Component Aand
Component B pumps. The park operation is
complete when green dot goes out. Verify the
park operation is complete before moving to next
step.
5. Press
to deactivate the system.
6. Turn off the air compressor, air dryer, and
breathing air.
7. Turn main power switch OFF.
To prevent electric shock do not remove any covers
or open the electrical enclosure door while the
power is ON.
8. Close all fluid supply valves.
9. Set PRESSURE RELIEF/SPRAY valves to
SPRAY to seal out moisture from the drain line.
10. Engage gun piston safety lock then close fluid
inlet valves Aand B.
Fusion
Probler
50
334946A