Pressure Control Board
20
332252A
Installation
1.
Install pressure control board (69) and tighten four
screws (38). Torque to 7.3 - 9.6 N•m (65 - 85 in-lb).
2.
Install wiring grommet and transducer (86).
See
Wiring Diagram
, page 27.
3.
Replace grommet and reconnect wires and place
back in wiring harness.
4.
Install control board box (61) and tighten four
screws (39). Torque to 3.4 - 4.0 N•m (30 - 35 in-lb).
5.
Install ground wire and tighten screw (26). Recon-
nect all wiring (see
Wiring Diagram
, page 27).
Torque to 2.5 - 3.2 N•m (22 - 28 in-lb).
6.
Replace back cover (68) and tighten four screws
(38). Torque to 3.4 - 4.0 N•m (30 - 35 in-lb).
7.
Replace shroud (58) and tighten screws (13) to
1.6 - 1.9 N•m (14 - 17 in-lb) and (31) to
4.5 - 5.1 N•m (40 - 45 in-lb).