Repair
22
3A8503C
TPC End Disassembly
1. Use a No. 2 Phillips screwdriver to loosen captive
fasteners and remove the TPC access cover (ZC).
2. Use a 1/4 in. or 6 mm slotted screwdriver to remove
the fastener (green) of the ground wire on the cable
being replaced.
3. Use a 1/8 in. or 3 mm slotted screwdriver to loosen
the screws on both connectors (J1A/J2A or
J1B/J2B) of the cable being replaced.
4. Unplug both connectors (J1A/J2A or J1B/J2B) from
the board of the TPC.
5. Lift the motor cable strain relief (ZA or ZB) out of the
groove (ZS) in the TPC.
TPC End Reassembly
1. Follow the
Install the Transfer Pump Controller
procedure on page 12.
Calibration
After replacing the motor cable, the pump must be
calibrated. See your Reactor 3 operation manual for the
calibration procedure.
ti39325b
ZC
ZA
ZB
ZS
Ground Screw
Summary of Contents for 26D000
Page 34: ...Dimensions 34 3A8503C...