Startup
16
3A9031A
b. Place drain tube in a grounded
waste pail.
c. Submerge siphon tube in a
grounded pail partially filled with
water or flushing fluid.
5. Place Prime/Spray valve in PRIME
position.
7. Align setting indicator with a low setting
on Pressure Control Knob.
8. Turn ON/OFF switch to
ON
position.
Power button is illuminated when ON.
Summary of Contents for 25U546
Page 41: ...Wiring Diagram 3A9031A 41 Wiring Diagram ...
Page 46: ...46 3A9031A ...
Page 47: ...3A9031A 47 ...