Quick Assembly Instructions:
We fully assemble and test the UPPERTONE, then minimally disassemble it before shipping it you.
We describe the re-assembly process below. Part numbers are noted in parenthesis. A complete list of the
parts used in the following steps is included at the end of this manual.
Figure 1 shows the UPPERTONE when it is fully assembled. Use this figure as well as the photograph on
the cover to guide you in the assembly process.
A.
Frame Assembly
(Figures 2 & 3)
1.
Lay the two
Frame Legs
(part #2) on the floor about 42"
apart with the pulleys facing out. Ensure that the four heavy
Rubber Caps
(52) at the ends of the
Frame Legs
have not
come loose during shipment.
2.
Position the
Main Frame
(1) onto the
Frame Legs
(Figure
2), making sure the weight arm is resting on the
Main
Frame
, not on the floor (Figure 3). Attach the
Main Frame
using the 3/8”
Hex Bolts
(48) and
Nuts
(42) provided.
3.
Bolt the
Frame Post
(3) to the
Main Frame
(1) using the
black button head bolts with the post bracket at the bottom
of the U-Frame as shown in Figure 2.
Figure 3
Figure 1
Figure 2
Frame Post (3)
Main
Frame (1)
Weight
Arm (4)
Rubber
Cap (52)
Frame
Leg (2)
Post
Bracket