5/16" WASHER
TOP BRIDGE RAIL
5/16" X 3-1/2" LAG SCREW
LOWER BRIDGE RAIL
59" CORNER POST TO CORNER POST
16" TOP OF TOP RAIL
TO BOTTOM OF
LOWER RAIL
STEP 16: MOUNTING BRIDGE RAILS TO FORT
1: PLACE THE BRIDGE RAILS AGAINST THE GREEN CORNER POST AND CENTER POST ON
THE PLAY SET.
2: LEVEL EACH TOP BRIDGE RAIL AND ATTACH THEM TO THE CORNER POSTS WITH 5/16" X
3-1/2" LAG SCREWS AND 5/16" WASHERS.
3: ATTACH EACH LOWER BRIDGE RAIL TO THE CORNER POSTS USING THE 16" DIMENSION
AT THE FORT AS SHOWN ON STEP 15 AND BELOW. ATTACH EACH LOWER BRIDGE RAIL
WITH 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS.
123