
SW
ING
BE
AM
SID
E
2" WOOD SCREW
REA
R SID
E
STEP 31: PANEL SLATS
1: BEGIN ON THE REAR SIDE OF THE FORT WITH THE TWO INNER SLATS BOARDS. THEY ARE GOING TO BE 17-1/2"
APART AFTER THEY ARE ATTACHED. THEY ARE SPACED 15" FROM THE OUTSIDE OF THE POSTS.
SPACE THE REMAINING TWO SLATS ON EACH SIDE 2-1/4" AWAY FROM EACH OTHER.
2: ON THE SWING BEAM SIDE OF THE FORT START NEAR THE FRONT. THIS SLAT IS SPACED 2-1/2" FROM THE CORNER
POST. SPACE THE REMAINING SLATS 2-3/16" APART FROM ONE ANOTHER.
15"
17 1/2"
2 1/4" SPACING
2 1/4" SPACING
15"
REAR SIDE
1
2 " FIRST SLAT
2
2 3
16 " SPACING
SWING BEAM SIDE
59